My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
! <br /> i <br /> ! 1 Agency. However in no event shall any provision for a deductibie provide for a <br /> 2 deductible in excess of$50,000.00. <br /> I 3 <br /> � 4 Prior to contract execution, the Contractor shall file with the Port of Everett, ACORD <br /> 5 Form Certificates of Insurance evidencing the minimum insurance coverages <br /> + 6 required under these specifications. <br /> I � <br /> 8 All insurance policies and Certificates of Insurance shall include a requirement <br /> � 9 providing for a minimum of 45 days prior written notice to the Contracting Agency of <br /> 10 any cancellation or reduction of coverage. All insurance coverage requirsd by this <br /> 11 section shall be written and provided by"occurrence-based" policy forms rather than <br /> 12 by"claims made"forms. <br /> i 13 <br /> 14 Failure on the part of the Contractor to maintain the insurance as required shall <br /> 15 constitute a material breach of contract upon which the Contracting Agency may, <br /> , 16 after giving five working days notice to the Contractor to currect the breach, <br /> ; 17 immediately terminate the contract or, at its discretion, procure or renew such <br /> 18 insurance and pay any and all premiums in connection therewith, with any sums so <br /> � 19 expended to be repaid to the Contracting Agency on demand, or at the sole <br /> � 20 discretion of the Contracting Agency, offset against funds due the Contractor from <br /> � 21 tlie Contracting Agency. <br /> 22 <br /> 23 All costs for insurance, including any payments of deductible amounts, shall be <br /> 24 considered incidental to and included in the unit contract ��rices and no additional <br /> 25 paymeM.will be made. <br /> 26 <br /> 27 <br /> 28 PROSECUTION AND PROGRESS <br /> 29 <br /> � 30 Prior to any subcontractor or lower tier subcontractor beginning work, the Contractor <br /> 31 shall submit to the Engineer a certification (WSDOT Form 420-004) that a written <br /> ; 32 agreement between the Contrector and the subcontractor or between the <br /> ' 33 subcontractor and any lower tier subcontractor has been executed. <br /> 34 <br /> I 35 A subcontractor or lower tier subcontractor will not be permitted to perform any work <br /> , 36 under the contract until the following documents have been completed and <br /> 37 submitted to the Engineer: <br /> � 38 <br /> 39 1. Request to Sublel Work (WSDOT Form 421-012), and <br /> 40 2. Contractor and Subcontractor or Lower Tier Subcontractor Certification for <br /> 41 Federal-aid Projects (WSDOT Form 420-004). <br /> � 42 <br /> � 43 The Contractor's records pertaining to the requirements of this Special Provision <br /> 44 shall be open to inspection or audit by representatives of the Contracting Agency <br /> � 45 during the life of the contract and for a period of not less than three years after the <br /> 46 date of acceptance of the contract. The Contractor shall retain these records for <br /> 47 that period. The Contractor shall also guarantee that these records of all <br /> ' 48 subcontractors and lower tier subcontractors shall be available and open to similar <br /> 49 inspection or audit for the same time period. <br /> 50 <br /> � 51 <br /> � Port oi Everetl FAWAT-03-039 <br /> Satellile RaillBarge Transfer Facility Final Port Review Draft <br /> Phase 1:Pier Conslruction 20 15 March 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.