My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> ! 1 PROGRESS SCHEDULES <br /> I 2 Description <br /> 3 The Contactor shall submit to the Engineer electronic progress schedules to <br /> 4 demonstrate the Contractor's plan to complete the work in the tim� specified and that <br /> I 5 progress is being made to meet the schedule. <br /> 6 <br /> 7 Submittals <br /> � 8 The following submittals are required. <br /> I 9 <br /> 1 o Submittal Format <br /> � 11 The eiectronic copy shali be submitted on a compact disc and/or as an attachment <br /> � 12 to e-mail per the schedule belew. The electronic copy must be cornpatible Microsoft <br /> 13 Project 2002 in MPP file format. <br /> 14 <br /> � 15 Pre-Award Progress Schedu/e <br /> 16 The Contractor shall submit an electronic copy and one hardcopy of a pre-award <br /> 17 progress schedule (total working de��s) to ihe Engineer before Award of this <br /> I 18 contract. <br /> 1 19 <br /> 20 Preliminary Progress Schedule <br /> � 21 The Contractor shail submit an electrenic copy and one hardcopy of a preliminary <br /> � 22 progress schedule (first 60 working days) to the Engineer no later than five c��lendar <br /> 23 days after lhe date the contract is executed. This preliminary progress schedule <br /> ' 24 shall show work to be performed during the first 60 days of the contract. <br /> � 25 <br /> 26 Progress Schedule <br /> � 27 The Contractor shall submit an electronic copy and one hardcopy of the progress <br /> 28 schedule (total working days) to the Engineer no later than 30 calendar days after <br /> 29 the date the contract is executed. <br /> 30 <br /> I31 Updated Progress Schedu/es <br /> 32 The Contractor shall submit an electronic copy and one hardcopy of the updated <br /> 33 progress schedule (totai working days)to the Engineer by the 5'"day of each month <br /> � 34 throughout the duration of this contract. <br /> � 35 <br /> 36 Contractor's Certifcation <br /> I 37 The Contractor shall submit with each schedule submission, certification that the <br /> 38 progress schedule submission is the actual schedule being utilized for the execution <br /> 39 of the work. <br /> � 40 <br /> � 41 Construction Requirements <br /> 42 The following electronic submittals are required. <br /> 43 <br /> 44 Pre-Award Progress Schedule <br /> 45 Show aciivities including, but not limited to the following: order of and time required <br /> 46 for the various construction phases of work and their major work activities. <br /> 47 <br /> Port of Everett FAWAT•03-039 <br /> ' Satellite RaillBargc Transfnr Facillty Final Port Reviow Drak <br /> Phase 1:Pier Conslruction 21 15 Mareh 2005 <br />