Laserfiche WebLink
i <br /> I1 Preliminary Progress Schedule <br /> 2 <br /> I 3 1. Show activities and m��estones including, h�t not limited to the following: <br /> 4 • Contract Execution Date <br /> 5 . Contractor secured permits <br /> I 6 • Submittals with Contracting Agency review time <br /> 7 • Eariy procurement activities for long leac; equipment and materials <br /> 8 • Owner furnished products delivery and pick up dates <br /> I 9 • Fabrication <br /> 10 • Mobilization <br /> 11 . Initiai site work <br /> I 12 • Work sequences and construction constraints <br /> 13 . Construction phasing <br /> 14 • Temporary poH�er milestones <br /> I 15 . Major demolition, foundation, structural, mechanical, electrical, and <br /> 16 architectural work <br /> 17 • Substantial completion <br /> I 18 • Physical Complelion <br /> 19 <br /> 20 Schedule format shall be Critica! Path Network with the critical path clearly <br /> I 21 identified. <br /> 22 <br /> 23 Progress Schedu/e <br /> I 24 Submit a detailed progress schedule beginning with Contract Execution and <br /> 25 continuing through Physical Completion. Show the duration and sequences of <br /> 26 activities required for complete per(ormance of the work reflecting means and <br /> 27 methods chosen by the Contractor. Show activities and milestones including, but <br /> I 28 not limited to the following: <br /> 29 <br /> 30 • Contract Execution Date <br /> I 31 • Each construction phase start and complelion dates <br /> 32 • Contractor secured permits <br /> 33 • General "submittals" activity with review time <br /> I 34 • Specific "submittais" and their review iime listed separately (rom the general <br /> 35 "submittals" activity if they are or have the potential to be on the critical path <br /> 36 . Early procurement activities for iong lead equipment and materials <br /> I 37 • Major equipment and structures: fabrication and delivery dates <br /> 38 • Owner furnished products anticipated delivery and pick up dates <br /> 39 • Various off-site testing dates <br /> f 40 • Mobilization onto the site <br /> � 41 • Temporary power mileslones including utility coordination milestones <br /> 42 • Various demolition activities <br /> i 43 • Temporary construction <br /> 44 • Civil site work <br /> 45 • Concrete work <br /> , 46 • Foundation work <br /> ' 47 • Pier work <br /> 48 • Rail work <br /> 49 • Office building work <br /> � Port of Evnrett FAWAT-03-039 <br /> Satellite RaillBarge Transfer Facility Final Port Review DraR <br /> Phase 1:Pier Conslructlon 22 15 March 2005 <br />