My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> I1 Preliminary Progress Schedule <br /> 2 <br /> I 3 1. Show activities and m��estones including, h�t not limited to the following: <br /> 4 • Contract Execution Date <br /> 5 . Contractor secured permits <br /> I 6 • Submittals with Contracting Agency review time <br /> 7 • Eariy procurement activities for long leac; equipment and materials <br /> 8 • Owner furnished products delivery and pick up dates <br /> I 9 • Fabrication <br /> 10 • Mobilization <br /> 11 . Initiai site work <br /> I 12 • Work sequences and construction constraints <br /> 13 . Construction phasing <br /> 14 • Temporary poH�er milestones <br /> I 15 . Major demolition, foundation, structural, mechanical, electrical, and <br /> 16 architectural work <br /> 17 • Substantial completion <br /> I 18 • Physical Complelion <br /> 19 <br /> 20 Schedule format shall be Critica! Path Network with the critical path clearly <br /> I 21 identified. <br /> 22 <br /> 23 Progress Schedu/e <br /> I 24 Submit a detailed progress schedule beginning with Contract Execution and <br /> 25 continuing through Physical Completion. Show the duration and sequences of <br /> 26 activities required for complete per(ormance of the work reflecting means and <br /> 27 methods chosen by the Contractor. Show activities and milestones including, but <br /> I 28 not limited to the following: <br /> 29 <br /> 30 • Contract Execution Date <br /> I 31 • Each construction phase start and complelion dates <br /> 32 • Contractor secured permits <br /> 33 • General "submittals" activity with review time <br /> I 34 • Specific "submittais" and their review iime listed separately (rom the general <br /> 35 "submittals" activity if they are or have the potential to be on the critical path <br /> 36 . Early procurement activities for iong lead equipment and materials <br /> I 37 • Major equipment and structures: fabrication and delivery dates <br /> 38 • Owner furnished products anticipated delivery and pick up dates <br /> 39 • Various off-site testing dates <br /> f 40 • Mobilization onto the site <br /> � 41 • Temporary power mileslones including utility coordination milestones <br /> 42 • Various demolition activities <br /> i 43 • Temporary construction <br /> 44 • Civil site work <br /> 45 • Concrete work <br /> , 46 • Foundation work <br /> ' 47 • Pier work <br /> 48 • Rail work <br /> 49 • Office building work <br /> � Port of Evnrett FAWAT-03-039 <br /> Satellite RaillBarge Transfer Facility Final Port Review DraR <br /> Phase 1:Pier Conslructlon 22 15 March 2005 <br />