My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> I1 • Beach restoration work <br /> 2 • Trenching work <br /> I 3 • Bulkhead work <br /> 4 • Mechanical work <br /> 5 • Electrica� work <br /> I 6 . Landscepe work <br /> 7 • On-sf�e testing <br /> 8 • Subst�ntial Completion <br /> I ° • Physical Completion <br /> in <br /> 11 Schedule format shall be Critical f'ath Network with the critical path clearly <br /> I 12 identified. <br /> 13 <br /> 14 The approved Progress Schedule will be considered the baseline schedule. <br /> I 15 Subsequent revisions wiil be considered as Updated Prograss Schedules. <br /> 16 <br /> 17 Updated Progress Schedules <br /> I 18 Update the progress schedules monthly as part of the progress payment process. <br /> 19 Failure to do so may cause Contracting Agency to withhold all or part of the monthly <br /> 20 progress payment untii the progress schedule is updated in a manner acceptable to <br /> 21 the Engineer. <br /> I 22 <br /> 23 Updated progress schedules shall meet requirements for the progress schedule and <br /> 24 shall reflect: <br /> I 25 • Actual progress to within five days prior to submission <br /> 26 • Unworkable days due to weather <br /> 27 • Approved changes in work scope and activities modified since previous <br /> I 28 submission <br /> 29 • Delays in submittals or resubmittals, deliveries, or work <br /> 30 . Adjusted or modified sequences of work <br /> j 31 • Other identifiable changes <br /> I 32 • Revised projections o(progress and completion <br /> 33 • Changed logic <br /> � 34 • Original Baseline <br /> ' 35 <br /> 36 Schedule format shall be Critical Path Network with the critical path clearly <br /> i 38 identified. <br /> 39 Critical Path Network Format <br /> � 40 The schedule shall be a comprehensive computer-generated schedule using CPM <br /> � 41 as generally outlined in the Associated General Contractors of America Publication <br /> 42 1107.1, "Construction Planning and Scheduling," latest edition. If a conflict occurs <br /> I 43 between the publication and this specification, this specification shall govern. <br /> 44 Additional requirements are as follows: <br /> 45 <br /> 46 • Schedule's catendar should be based on working days and have days as a <br /> i47 unit o(measure <br /> 48 • Show complete interdependence and sequence of construction and project <br /> 49 related activities reasonably required to complete the work <br /> IPort of Everetl FAWATA3•039 <br /> Satellite RaillBarge Transfer Facility Flnal Port Review Draft <br /> IPhase 1:Pier Construction 27 15 March 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.