My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> � 1 Elevations + 0.005 foot <br /> 2 <br /> 3 Section 6-05.3(11)A is supplemented with ihe following: <br /> 4 <br /> 5 The Contracting Agency, at its discretion, may spot-check the Contractor's surveying. <br /> 6 These spol-checks wiil not change the requirements for normal checking and testing as <br /> 7 described elsewhere, and do nol relieve the Contractor of the responsibility of producing <br /> 8 a finished product that is in accordance with the Plans, Standard Specifications, and <br /> 9 5pecial Provisions oF this contract. <br /> I10 <br /> 11 In all disputes concerning accuracy of lines and elevations, the Contracting Agency shall <br /> 12 be assumed correct and the Contractor shall correct the discrepancies before <br /> ( 13 construction work may proceed. No additional compensation shall be paid for this <br /> � 14 corrective work. <br /> 15 <br /> I 16 Payment <br /> 17 All labor, materials, tools, and equipment necessary to perform the work as specified, <br /> 18 shall be included in the lump sum price for"Surveying". <br /> � 19 <br /> 20 <br /> 21 Section 1-10 TEMPORARY T12AFFIC CONTROL <br /> ( 22 1-10.1 General <br /> 23 The Contractor shall provide fiaggers, signs, and other tra�c control devices not <br /> � 24 otherwise specifi�d as being furnished by the Contracting Agency. The Contractor shall <br /> 25 erect and maintain all construction signs, warning signs, detour signs, and other traffic <br /> 26 control devices necessary to warn and protect the public at all times from injury or <br /> ( 27 damage as a result of the Contractor's operations which may occur on highways, roads, <br /> 28 or slreets. No work shall be done on or adjacent to the roadway until all necessary signs <br /> 29 and traffic control devices are in place. <br /> 30 <br /> ' 31 These flaggers, signs, and other traffic control devices shall be used for the safety of the <br /> 32 public, the Contractor's employees, and Contracting Agency's personnel and to facilitate <br /> 33 the movement of the traveling public. They may be used for the separation or merging of <br /> I 34 public and construction traffic when in accordance with a specific approved tra�c control <br /> 35 plan. <br /> 36 <br /> I 37 Upon failure of the Contractor to immediately provide flaggers; erect, maintain, and <br /> 38 remove signs; or provide, erect, maintain, and remove other traffic control devices when <br /> 39 ordered lo do so by the Engineer, the Contracting Agency may, without further notice to <br /> ' 40 the Contractor or the Surety, perform any of the above and deduct all o( the costs from <br /> 41 the Contractor's payments. <br /> 42 <br /> � 43 The Contractor shall be responsible for providing adequate fiaggers, signs, and other <br /> 44 traftic control devices for the protection of the work and the public at all times regardless <br /> 45 of whether or not the (laggers, signs, and other traffic control devices are ordered by the <br /> 46 Engineer, furnished by the Contracting Agency, or paid for by the Contracting Agency. <br /> � 47 The Contractor shall be liable (or injuries and damages to persons and property suffered <br /> 48 by reason of the Contractor's operations or any negligence in connection therewith. <br /> 49 <br /> � Port of Everett FAWAT-03019 <br /> Satellite RaillBarge Transfer Facility Final Port Review Draft <br /> � Phase 1:Pier Construction 28 15 March 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.