My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> I1 1-103 Tra�c Control Management <br /> 2 1-10.2(1) General <br /> i 3 It is the Contractor's respunsibility to plan, conduct and safely perfortn the work. The <br /> 4 contractor shall provide an individual who is a certified Worksite Traffic Control <br /> 5 Supervisor (TCS) to direct the installation, monitoring, modification, and maintenance of <br /> � 6 the required traffic control. The certification shall conform to the requirements of the <br /> 7 American Tra�c Safety Service� 4ssociation (ATSSA)or an approved equal. <br /> 8 <br /> I 9 The TCS shall coordinate work with the Contractors Project Superintendent. The TCS <br /> 10 shall conduct weekly planning sessions with the Project Superintendent to schedule <br /> 11 traffic control for all major material deliveries to the project site, including but not limited <br /> 12 to: concrete, pile, gravel, sand, borrow, paving materials, drainage and electrical items. <br /> f 13 <br /> � 14 The Contractor shall identify an altemate TCS who can assume the duties of the <br /> 15 assigned or primary TCS in the event of that person's inability to perform. Such <br /> I 16 alternates shall meet the same requirements as the primary TCS. <br /> l 17 <br /> 18 The Contractor shall maintain 24-hour telephone numbers at which the TCS can be <br /> I 19 contacted and be available upon the Engineer's request at other than normal working <br /> 20 hours. The TCS shall have the appropriate personnel, equipment, and material available <br /> 21 at all times in order to expeditiously correct any deficiency in the tra�c control system. <br /> � 22 <br /> 23 1-10.2(1) Treffic Control Supervisor <br /> 24 A Tra�c Control Supervisor(TCS)shall be on the project whenever traffic control labor is <br /> � 25 required or less frequently, as approved by the Engineer. <br /> 26 <br /> 27 The TCS shall personally perform all the duties of the TCS. During non-work periods, the <br /> 28 TCS shall be available to the iob site within a 45-minute time period after notification by <br /> I 29 the Engineer. <br /> 30 The TCS's duties shall include: <br /> 31 <br /> { 32 1. Inspecting traffic control devices for proper location, installation, <br /> ! 33 message, cleanliness, and effect on the traveling public. Traffic control <br /> 34 devices shall be inspected each work shift except that Class A signs <br /> � 35 need to be checked only once a week. Traffic control devices left in <br /> � 36 place for 24 hours or more should also be inspected once during the <br /> 37 nonworking hours when they are initially set up (during daylight or <br /> � 38 darkness, whichever is opposite of the working hours). <br /> 39 <br /> 40 2. Preparing a daily traKc control diary, which shall be submitted to the <br /> � 41 Engineer no later than the end of the next working day to become a part <br /> 42 of the project records. The Contractor may use their own form if it is <br /> 43 apprcved by the Engineer. Include in the diary such items as: <br /> 44 <br /> I 45 a. When signs and traffic control devices are installed and <br /> � 46 removed, <br /> 47 b. Location and condition of signs and tra�c control devices, <br /> f 48 c. Revisions to the approved traffic control plan (TCP), and <br /> � 49 d. Observations of tra�c conditions. <br /> 50 <br /> I <br /> Port of Everetl FAWAT-03-039 <br /> Satellite RaillBarge Transfer Pacility Final Port Review DroR <br /> ( Phase 1:Pier Construction 29 15 March 2005 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.