My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 1 3. Establishing and maintaining two-way radio contact among flaggers for <br /> 2 the purpose of coordinating construction traftic movements through the <br /> � 3 intersection of Front Street and State Route 525, and for the purpose of <br /> 4 dispatching of trucks from the inbound staging area. <br /> 5 <br /> I 6 4. Ensuring that corrections are made if traffic control devices are not <br /> � 7 functioning as required. The TCS may make minor revisions to the <br /> 8 approved traffic control plan to accortimodate site conditions as long as <br /> � 9 the original intent of ihe tra�c control plan is maintained and the <br /> 10 revision has concurrence of the Engineer. <br /> 11 <br /> 12 5. Monitoring ferry tra�c queues and providing fiagger control of ferry <br /> � 13 traffic queues around the inbound staging area, using appropriate <br /> � 14 advance signing, if necessary. <br /> 15 <br /> 16 6. Attending ira�c control coordinating meetings or coordination activities <br /> 17 as authorized by the Engineer. <br /> 18 <br /> 19 7. Overseeing all requirements of the contract which contribute to the <br /> j 20 convenience, safety, and orderly movement of vehicular and pedestrian <br /> 21 tra�c. <br /> 22 <br /> � 23 8. Ensuring that all needed traffic control devices are available and in good <br /> 24 working condition prior to the need to install those devices. <br /> 25 <br /> � 26 9. Having a current set of approved TCP's and applicable contract <br /> ' 27 provisions in compliance with the latest adopted edition o( the Manual <br /> 28 on Uniform Traffic Control Devices including the Modifications to the <br /> � 29 MUTCD for Streets and Highways for tlie State of Washington and <br /> � 30 applicable standards and specifications. <br /> 31 <br /> 32 The TCS may perform the work described by "Traf(ic Control Labor" as long as the <br /> 33 duties of the TCS are accomplished. Possession of a currenl flagging card by the TCS is <br /> 34 mandatory. <br /> � 35 <br /> + 36 A reflective vest and a hard hal shail be worn by the TCS. <br /> 37 <br /> � 38 1-10.2(2) Traffic Control Plans (TCPs) <br /> 39 The traffic control plan or plans appearing in the contract plans show a method of <br /> 40 handling traffic. All flaggers are to be shown on the tra�c control plan except (or <br /> � 41 emergency situations. The Contractor shall designate and adopt in writing the specific <br /> 42 traffic conirol pian or plans required for their method of performing the work. If the <br /> 43 Contractor's methods diHer (rom the contract tra�c control plan(s), the Contractor shall <br /> 44 propose modificalion of the traffic control plan(s) by showing the necessary construction <br /> } 45 signs, flaggers, and other traKc control devices required for the project. The Contractor's <br /> � 46 modified traffic control plan(s) shall be in accordance with the established standards for <br /> 47 plan development as shown in the MUTCD, Part VI. The Contractor's letter designating <br /> � 48 and adopting the specific traffic control plan(s) or any proposed modified plan(s) shall be <br /> 49 submitted to the Engineer for approval at least ten calendar days in advance of the time <br /> 50 the signs and other traffic control devices will be required. The Contractor shall be solely <br /> i <br /> Port ot Everett FAWAT•03-039 <br /> Satallitc RaillBarge Transfer Facility Final Port Review Dra11 <br /> IPhase 1:Pier Construction 30 15 March 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.