My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> ; <br /> I 1 semipermanenl nature. Sign and support installation for Class A signs shall be in <br /> 2 accordance with the Contract Plans or ihe Standard Plans. Class B construction signs <br /> I 3 are those signs that are placed and removed daily or are used for short durations which <br /> � 4 may extend for one or more days. They are mounted on porlable or temporary <br /> 5 mountings. Ii it is necessary to add weight to the signs for stability, only a bag of sand <br /> � 6 that will rupture on impact shall be used. The bag of sand shall: (1) be furnished by the <br /> 7 Contractor, (2) have a maximum weight o( 40 pounds, and (3) be suspended no more <br /> 8 than 1 foot from the ground. In the event of disputes, the Engineer wilt determine if a <br /> � 9 construction sign is considered as a Ciass A or B construction sign. <br /> 10 <br /> 11 When Ciass A or B �onstruction signs are required, the work to provide these signs shail <br /> 12 be: <br /> � 13 1. Furnishing, removing, and disposing of the pusts or supports for the signs; <br /> 14 2. Initial acquisition irom the Engineer and ultimate return to the Engineer of the <br /> 15 required Contracting Agency-furnished signs; <br /> � 16 3. Initial installation and subsequent removal of both Class A and B construction <br /> . 17 signs; and <br /> 18 4. All other incidentals necessary for providing Class A or B construction signs <br /> + 19 according to the approved traffic control plan(s). <br /> � 20 <br /> 21 No item will be provided in the bid proposal (or Class B consiruction signs. Payment for <br /> � 22 Class B construction signs will be limited to the labor cost to do the work described in <br /> 23 5ection 1-10.3(1). All other costs for the work to provide Class B construction signs shali <br /> 24 be included in the unit contract price for the various other items of the work in the bid <br /> t 25 proposal. <br /> � 26 <br /> 27 Signs, posts, or supports that are lost, stolen, damaged, desiroyed, or which the <br /> 28 Engineer deems to be unacceptable, while their use is required on the project, shall be <br /> � 29 replaced by the ConUactor without additional compensation. <br /> � 30 <br /> 31 1-10.3(4) Temporary Traffic Control Devices <br /> � 32 When the bid proposal includes an item for "Temporary Traffic Control Devices," the <br /> � 33 work required for this item shall be furnishing barricades, flashers, cones, tra�c safety <br /> 34 drums, and other temporary traffic control devices, unless the contract provides for <br /> � 35 furnishing a specific temporary traffic conirol device under another item. The item <br /> 36 "Temporary Traffic Control Devices" includes: <br /> 37 <br /> � 38 1. Initial delivery to the project site (or temporary storage) in good repair and in <br /> � 39 clean usable condition, <br /> 40 2. Repair or replacement when they are damaged and they are still needed on the <br /> ) 41 project, and <br /> ( 42 3. Removal from the project site when they are no longer needed on the project. <br /> 43 <br /> 44 1-10.4 Measurement <br /> 45 Tra�c control labor will be by the hour for each hour a person is actually performing the <br /> 46 work described in Section 1-10.3(1). Portions of an hour will be rounded up to a whole <br /> 47 hour. <br /> 48 <br /> 49 Class A construction signs will be by the square foot of panel area. A Class A <br /> r <br /> 50 consiruction sign may be used in more than one location and will be measured for <br /> i <br /> Port of Everett PAWAT-D3-039 <br /> Satellite RaI1lBarge Transfer Facility Final Port Revlew Drak <br /> � Phase 1:Pier Construction 34 15 Mareh 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.