My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> , 1 payment for each new installalion. Class B construction signs will not be measured for <br /> 2 payment. Sign posts or supports will not be measurei for payment. <br /> 3 <br /> � 4 TraHic control supervisor will be measured per hour for each hour a person is actually <br /> 5 performing the duties described in Section 1-10.2(1) as authorized by the Engineer. <br /> 6 Portions of an hour will be rounded up to a whole hour. A minimum of 4 hours will be <br /> � 7 paid when the Engineer aulhorizes the TCS to be on the job site during nonworking <br /> 8 shifts. <br /> ! 9 <br /> 10 No specific unit of ineasurement will appiy to the lump sum item of tempora�y traffic <br /> 11 control devices. <br /> 12 <br /> � 13 Traffic control vehicle wili be by the day on the days when a vehicle or vehicles are <br /> � 14 actually being used to periorm the work described in Section 1-10.3(2). More than one <br /> 15 vehicie may be used to perform this work, however, all vehicles used on any day will be <br /> � 16 measured as one unit for that day. Vehicles required to be furnished by any other <br /> � 17 specifications such as Seclions 1-10.2(1) and 1-10.3(6) may be used for doing the work <br /> 18 required by Section 1-10.3(2), however, those vehicles will nol be measured for payment <br /> � 19 under this section. <br /> , 20 <br /> 21 The days eligibie (or "Tra(fic Control Vehicle," will be those days that a vehicle or <br /> � 22 vehicles are actually used for the previously described work. The Contractor may use <br /> y 23 more than one vehicle to periorm this work, however, ali the vehicles used will be <br /> 24 considered one unit tor the days thal more than one vehicle is used. Vehicies required to <br /> . 25 be furnished by any other specifications such as Section 1-10.3(6) may be used for <br /> 26 doing the work required by this section but wiil be excluded from payment under this <br /> 27 section. <br /> 28 <br /> � 29 1-10.5 Payment <br /> 30 Payment will be made in accordance wilh Section 1-04.1, for the following bid items <br /> 31 when ihey are included in the proposal: <br /> � 32 <br /> 33 "Traffic Control Labor," per hour. <br /> 34 The unit contract price per hour shall be full pay for all costs for ihe labor provided <br /> P 35 for performing those construction operations described in Section 'i-10.3(1) and as <br /> 36 authorized by the Engineer. Payment under this item shall be limited to the hours <br /> 37 the worker is actually performing the work. <br /> 38 <br /> � 39 "Construction Signs Class A," per square foot panel area. <br /> 40 The unit contract price per square foot of panel area shall be full pay for all costs for <br /> � 41 performing the work described in Seclion 1-10.3(3) and Section 1-10.3(4). This <br /> 42 payment will include all labor, equipment, and vehicles necessary for tlie initial <br /> 43 acqusition, the inilial insiallation of Class A signs, and ultimate return of all <br /> 44 Contracting Agency-furnished signs. Payment will not be made for signs delivered <br /> � 45 to, or removed (rom, the project without the approval of the Engineer. <br /> � 46 <br /> 47 "Traffic Conlrol Supervisor," per hour. <br /> , 48 The unit contracl price per hour for "Traffic Control Supervisor" shali be full pay for <br /> 49 each hour a person performs the duties described in Section 1-10.2(1) including <br /> 50 when performing traffic control labor dulies. <br /> 51 <br /> Port of Everett FAWAT-03-039 <br /> Satelllle RaI118arge Transfer Facillty Final Port Review Draft <br /> � Phase 1:Pler Construclion 35 75 March 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.