Laserfiche WebLink
i <br /> , 1 payment for each new installalion. Class B construction signs will not be measured for <br /> 2 payment. Sign posts or supports will not be measurei for payment. <br /> 3 <br /> � 4 TraHic control supervisor will be measured per hour for each hour a person is actually <br /> 5 performing the duties described in Section 1-10.2(1) as authorized by the Engineer. <br /> 6 Portions of an hour will be rounded up to a whole hour. A minimum of 4 hours will be <br /> � 7 paid when the Engineer aulhorizes the TCS to be on the job site during nonworking <br /> 8 shifts. <br /> ! 9 <br /> 10 No specific unit of ineasurement will appiy to the lump sum item of tempora�y traffic <br /> 11 control devices. <br /> 12 <br /> � 13 Traffic control vehicle wili be by the day on the days when a vehicle or vehicles are <br /> � 14 actually being used to periorm the work described in Section 1-10.3(2). More than one <br /> 15 vehicie may be used to perform this work, however, all vehicles used on any day will be <br /> � 16 measured as one unit for that day. Vehicles required to be furnished by any other <br /> � 17 specifications such as Seclions 1-10.2(1) and 1-10.3(6) may be used for doing the work <br /> 18 required by Section 1-10.3(2), however, those vehicles will nol be measured for payment <br /> � 19 under this section. <br /> , 20 <br /> 21 The days eligibie (or "Tra(fic Control Vehicle," will be those days that a vehicle or <br /> � 22 vehicles are actually used for the previously described work. The Contractor may use <br /> y 23 more than one vehicle to periorm this work, however, ali the vehicles used will be <br /> 24 considered one unit tor the days thal more than one vehicle is used. Vehicies required to <br /> . 25 be furnished by any other specifications such as Section 1-10.3(6) may be used for <br /> 26 doing the work required by this section but wiil be excluded from payment under this <br /> 27 section. <br /> 28 <br /> � 29 1-10.5 Payment <br /> 30 Payment will be made in accordance wilh Section 1-04.1, for the following bid items <br /> 31 when ihey are included in the proposal: <br /> � 32 <br /> 33 "Traffic Control Labor," per hour. <br /> 34 The unit contract price per hour shall be full pay for all costs for ihe labor provided <br /> P 35 for performing those construction operations described in Section 'i-10.3(1) and as <br /> 36 authorized by the Engineer. Payment under this item shall be limited to the hours <br /> 37 the worker is actually performing the work. <br /> 38 <br /> � 39 "Construction Signs Class A," per square foot panel area. <br /> 40 The unit contract price per square foot of panel area shall be full pay for all costs for <br /> � 41 performing the work described in Seclion 1-10.3(3) and Section 1-10.3(4). This <br /> 42 payment will include all labor, equipment, and vehicles necessary for tlie initial <br /> 43 acqusition, the inilial insiallation of Class A signs, and ultimate return of all <br /> 44 Contracting Agency-furnished signs. Payment will not be made for signs delivered <br /> � 45 to, or removed (rom, the project without the approval of the Engineer. <br /> � 46 <br /> 47 "Traffic Conlrol Supervisor," per hour. <br /> , 48 The unit contracl price per hour for "Traffic Control Supervisor" shali be full pay for <br /> 49 each hour a person performs the duties described in Section 1-10.2(1) including <br /> 50 when performing traffic control labor dulies. <br /> 51 <br /> Port of Everett FAWAT-03-039 <br /> Satelllle RaI118arge Transfer Facillty Final Port Review Draft <br /> � Phase 1:Pler Construclion 35 75 March 2005 <br />