My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> i <br /> , 1 REMOVAL OF STRUCTURES <br /> 2 Description <br /> � 3 Section 2-02.1 of the Standard Specifications is supplemented with the following: <br /> 4 <br /> r 5 The Contractor shall remove and dispose of or salvage items as shown and noted in <br /> i� 6 the Plans or these Special Provisions. The Contractor shall dispose of all items in <br /> 7 accordance with current Federal, state, and local regulations and provisions, and <br /> � 8 following Best Management Practice. This work shall consist of removal, wholly or in <br /> 9 part, and safisfactory disposal of any obstructions, as shown on Plans or as directed <br /> 10 by the Engineer. Removals under this section also include, but are not limited to: <br /> 11 pile stubs, concrete walls and footings, concrete slabs, steel stairvvays, light <br /> E 12 standards, fire hydrants and other fire protection systems, pipes, catch basins, inlets, <br /> � 13 and manholes, asphalt pavement, concrete �nd/or asphalt sidewalks, revetment, <br /> 14 curbs and curb and gutter, traffic islands and traffic curbs, beam gua,-drail, fence, <br /> � 15 gates, raised pavement markers, striping, buttons, signs, and debris piles. <br /> 16 <br /> ` 17 It is suggested that prospective bidders inspect the site in detail to determine the existing <br /> 6 18 conditions and the parts to be removed. Interested parties shall contact the Port of <br /> 19 Everett prior to visiting the site to make appropriate arrangements. <br /> � 20 <br /> 21 Construction Requirements <br /> ?2 Section 2-02.3 of the Standard Specifications is supplemented with the foliowing: <br /> � 23 <br /> 24 Any damage due to the Contractor's operations to the portions of the existing <br /> 25 structurPs which are to remain in place shall be repaired by the Contractor at no <br /> I 26 cost to the Port. Repairs shall be approved by the Engineer. <br /> 27 <br /> 28 Submittal Requirements <br /> 29 The Contractor shall submil to the Engineer for approval a Demolition Plan with <br /> � 30 working drawings and a safety plan as specified in WORK PLAN. The Demolition <br /> 31 Plan shall demonstrate thal the methods and equipment to be used are adequate <br /> 32 for ihe intended purpose and will provide satisfactory results. It shall provide for <br /> � 33 debris co�tainment, and containmenl and immediate retrieval of deleterious material <br /> 34 that may inadvertently fall in the waler. <br /> 35 <br /> � 36 The Demolition Plan shall show support bents, bracing, guys, lifting devices, liftinq <br /> 37 attachments, the sequence of demolition, the type of equipment to be used, the <br /> 38 location of cranes and barges, ihe location of support or lifting points, and the <br /> � 39 weights of structure parts being removed. The Plan shall also detail how debris is <br /> 40 contrclled and prevented from falling into the water. The Plan shall show all stages <br /> 41 of demolition of work. <br /> 42 <br /> ' 43 Disposal of Creosoted Materials <br /> 44 All creosoted material and associated sediments shall be disposed of by the <br /> 45 Contractor in accordance with the Special Provision DISPOSAL OF CREOSOTED <br /> '� 46 MATERIALS. <br /> 47 <br /> � Port of Evarett FAWAT-03-039 <br /> Satelllte RaillBarge Transfer FaciNty Final Port Review Drak <br /> � Phase 1:Pier Construction 39 15 March 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.