My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> � <br /> � 1 The lump sum contract price for"Removal oi Stniclures" shall be full compensation <br /> 2 for all labor, equipment and materials, to perform the work as specified, except for <br /> � 3 those items specifically paid for under"Disposal of Creosoted Materials". <br /> 4 <br /> 5 All costs associated with removal of obstructions, as described above, will be paid <br /> � 6 by force account under the item "Force Account Removal of Obstruction", as <br /> 7 approved by the Engineer. This pay item will not be used to pay for repairs or <br /> 8 remediation of damage resulting from the Contractor's work on other items in the <br /> � 9 Contract. <br /> 10 <br /> 11 Costs associated with other removal work identified in the Plans and not addressed <br /> 12 elsewhere in the Special Provisions shall be included in other bid items. <br /> � 13 <br /> 14 DISPOSAL OF CREOSOTED MATERIALS <br /> � 15 The Contractor shall dispose of all creosoted timber 2nd associated debris as shown in <br /> 16 the Plans and as described in the Provisions under REMOVAL OF STRUCTURES. <br /> 17 <br /> � 18 All creosoted material, pile stubs and associated sediments shall be disposed of by the <br /> 19 Contractor in a landfill which meets lhe liner and leachate standards of the Minimum <br /> 20 Functional Standards, Chapter 173-304 WAC. The Contractor will be required to provide <br /> � 21 receipts from the disposal facility to the Project Engineer. <br /> ' 22 <br /> 23 Measurement <br /> � 24 The approximate quantity oi material in this item is as follows: <br /> � 25 <br /> 26 10 timber pile stubs <br /> � 27 <br /> 28 The quantity is listed only for the convenience of the Contractor in determining the <br /> 29 volume of work involved and is nol guaranteed to be accurate. The prospective bidders <br /> 30 shall verify this quantity before submitting a bid. No adjustments other tnan for approved <br /> I 31 changes will be made in the lump sum contract price for "Disposal of Creosoted <br /> � 32 Material" even though the actual quantity may deviate from the approximate quantity <br /> 33 shown here. <br /> f 34 <br /> ( 35 Payment <br /> 36 The lump sum contract price for "Disposal oi Creosoted Material" shail be full <br /> r 37 compensation for all labor, equipment, tools and materials necessary to transport and <br /> � 38 dispose of the material in accordance with all State and Federal laws and as specified. <br /> j 39 Section 2-04 Haul <br /> ( 40 Section 2-04.1 Description <br /> 41 This work consists of transporting excavated material and construction equipment and <br /> ( 42 malerials to and from the project sile. <br /> 43 <br /> I <br /> i <br /> Port of Everett FAWAT-03039 <br /> Satellite Rail/Barge Transfer Facillty Final Port Ravlaw Draft <br /> i� Phase 1:Pier Cons[ructlon 42 75 Mareh 2005 <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.