My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> � 1 5-04.3(5)D Soil Residual Herbicide <br /> 2 Where shown in the Plans, the Contractor shall apply one application of an <br /> � 3 approved soil residual herbicide. Paving shall begin within 24 hours after <br /> 4 application of the herbicide. Any area that has not been paved within the time <br /> 5 limit or that has been rained on, shall be treated again at the Contractor's <br /> 6 expense. The herbicide shall be applied uniformly in accordance with the <br /> � ' 7 manufacturer's recommendations. <br /> 8 <br /> � 9 The material to be used shall be registered with the Washington State <br /> 10 Department of Agriculture for use under pavement. Before use, the Contractor <br /> 11 shali receive approval of the material to be used and the proposed rate of <br /> 12 application, from the F.ngineer. The following information shall be included in <br /> { 13 the request for approval of the material: Brand name of the material, <br /> � 14 manufacturer, Environmental Pro2ection Agency (EPA) registration number, <br /> 15 material safety data sheet, and proposed rate of application. <br /> ; 16 <br /> 17 5-04.3(5)E Pavement Repair <br /> 18 The Contractor shall excavate pavement repair areas and shall backfill these <br /> 19 with HMA in accordance with the details shown in the Plans and as staked. <br /> ' 20 <br /> 21 The actual excavation depth may vary to a maximum depth of 1-foot maximum, <br /> r 22 depending upon where stable foundatior material is encountered, as <br /> I 23 determined by the Engineer. <br /> 24 <br /> � 25 The minimum width of any pavement repair area shall be 3 feet unless shown <br /> 26 otherwise in the Plans. All pavement repair areas shall be sawcut before <br /> � 27 removal, or shall be removed by a pavement grinder approved by the Engineer. <br /> 28 <br /> ` 29 Asphalt for tack coat shall be required as specified in Section 5-04.3(5)A, and <br /> 30 shall be applied to all edges of existing pavement in the pavement repair area. <br /> 31 <br /> � 32 The Contractur shall excavate only within one lane at a time. The areas shall <br /> 33 be excavated, backfilled, and compacted within the same day's working shift, in <br /> 34 accordance with the details shown in ihe Plans and to the satisfaction of the <br /> � 35 Engineer. <br /> 36 <br /> 37 Excavated materials wiil become the property oF the Contractor for disposal off <br /> 38 the right of way. <br /> 39 <br /> 40 The Contractor shall conduct the excavation operations in a manner that will <br /> 41 protect the pavement areas not designated to be removed. Pavement not <br /> � 42 designated to be removed that is damaged as a result of the Contractor's <br /> 43 operations shali be repaired by the Contractor to the salisfaction o( the <br /> 44 Engineer at no cost to the Contracling Agency. <br /> + 45 <br /> 46 Placement of the HMA backfill shall be accomplished in lifts. Each lift shali not <br /> 47 exceed 0.35 foot compacted depth. Compaction shali be accomplished by <br /> i 48 mechanical tamper or a roller as approved by the Engineer. <br /> 49 <br /> 50 HMA for pavement repair shall be HMA Class A, B, E, or F at the Contractor's <br /> I 51 option, unless otherwise specified in the contract. <br /> Port of Everett FAWAT-03-039 <br /> Satellite RaiUBarge Transfnr Facillty Final Port Revlew Dratl <br /> Phase 1:Pier Construction 54 15 March 2005 <br />