My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
! <br /> I <br /> ( 1 C. Adjustments <br /> 2 <br /> I 3 1. Aggregates. Upon written request from the Contractor, the Projecl <br /> 4 Engineer may approve field adjuetments to the JMF including the <br /> 5 Contractor's proposed combinirn• ratios for mineral aggregate <br /> I 6 stockpiles and blend sand. The maximum allowed gradation <br /> 7 change shall be 2 percent for th�� aggregate retained on the <br /> 8 No. 10 sieve and above, 1 percent for the aggregate passing the <br /> 9 No. 10 and No. 40 sieves, and 0.5 percent for the aggregate <br /> 10 passing ihe No. 200 sieve. Blend sand may be changed a <br /> 11 maximum of 5 percent. The above adjustments and/or any further <br /> 12 adjustments as ordered by the Engineer will be considered as a <br /> 13 new JMF. Adjustments beyond these limits will require <br /> I 14 development of a new JMF. The adjusted JMF plus or minus the <br /> 15 allowed tolerances shall be within the range of the broad band <br /> j 16 specifications. <br /> I 17 <br /> 18 2. Asphalt Binder Content. The Project Engineer may order or <br /> I 19 approve the Contractor's request to change asphalt binder <br /> 20 content a maximum of 0.3 percent from the approved JMF. No <br /> 21 field adjustments of the JMF relative to the asphalt binder content <br /> I 22 exceeding 0.3 percent from the initial JMF will be made without <br /> 23 the approval of the Materials Engineer. <br /> 24 <br /> I 25 D. Commercial HMA Acceptance. The contractor shall submit a <br /> 26 certification ihat the mix design submitted meets the requirements of <br /> 27 Proportions of Materials. Verification of the mix design by the <br /> 28 Contracting Agency is not required. The Project Engineer will <br /> I 29 determine anti-sirip requirements for the HMA. <br /> � 30 <br /> 31 4. Hot Mix Asphalt Mixture <br /> I 32 <br /> 33 A. 5ampling <br /> 34 <br /> � 35 1. A sample wiil not be obtained (rom either the first or last 25 tons <br /> 36 of mix produced in each production shift. <br /> 37 <br /> � 38 2. Samples for compliance of gradation and asphalt binder content <br /> � 39 will be obtained on a random basis from the hauling vehicle. The <br /> d0 Contractor shall provide adequate platforms to enable sample�, to <br /> � 41 be obtained in accor�ence with V�!^nTC FOP for AASHTO T 168. <br /> 42 The platforms shall allow the sample to be taken without the <br /> 43 Engineer enlering the hauling vEhicle. <br /> 44 <br /> � 45 B. Definition of Sampling Lot and Sublot. For the purpose of acceptance <br /> 46 sampling and testing, a lot is defined as the total quantity of material <br /> 47 or work produced for each job mix formula (JMF), placed and <br /> � 48 represented by randomly selected samples tested for acceptance. All <br /> 49 of the test results obtained irom the acceptance samples shall be <br /> 50 evaluated collectively and shall constitute a lot. Only one lot per JMF <br /> IPort ot Everett FAWAT•03-0�9 <br /> Satellite RaillBarge Transfer Facility Final Porl Review Dral'l <br /> IPhase 1:Pier Construction 80 15 March 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.