Laserfiche WebLink
i <br /> 1 1 will be expecled to occur. The JMF (Job Mix Formula) is ds!ined in <br /> 2 Basis of Acceptance. <br /> I 3 <br /> 4 The Contractor may request a change in the JMF. If the request is <br /> 5 approved, all of the material produced up to the time of the change will <br /> I 6 be evaluated on the basis of available tests and a new lot will begin. <br /> 7 The quantity represented by each sample will constitute a sublot. <br /> 8 Sampling and testing for statistical evaluation shall be performed on a <br /> I 9 random basis at the frequency of one sample per sublot, with a <br /> 10 minimum of five sublots per class of HMA. Sublot size shall be <br /> 11 determined to the nearest 100 tons to provide not less than five <br /> 12 uniform sized sublots, based on proposal quantities, with a maximum <br /> � 13 sublot size of S00 tons. <br /> 14 <br /> 15 Sampling and testing for nonstatistical evaluation shall be perfortned <br /> { 16 on a random basis at a minimum frequency of one sample for each <br /> � 17 sublot of 400 tons or each day's production, whichever is least. When <br /> 18 proposal quantities exceed 1,200 tons for a class of HMA under <br /> I 19 nonstatistical evaluation, sublot size shall be determined to the <br /> 20 nearest 100 tons to provide not less than three uniform sized sublots, <br /> 21 based on proposal quantities, with a maximum sublot size of 800 tons. <br /> � 22 <br /> 23 C. Test Results. The Engineer will fumish the C�ntractor with a copy of <br /> 24 the results of all acceptance testing performed in the field at the <br /> I 25 beginning of the next paving shift. The Engineer will also provide the <br /> 26 Composite Pay Factor (CPF) of the completed sublots after three <br /> 27 sublots have been produced. The CPF will be provided by the <br /> 28 midpoint of the next paving shift after sampling. <br /> ( 29 <br /> 30 Individual acceptance sample test results (gradation and asphalt <br /> 31 binder content) may be challenged by the Contractor. A written <br /> I 32 challenge of the test results by the Contractor shall be received by the <br /> 33 Project Engineer within five working days after receipt of the specific <br /> 34 test results. A split of the original acceptance sample shall be sent, for <br /> � 35 testing, to a materials testing lab as determined by the Engineer. The <br /> 36 challenged sample will not be tested with the same equipment or by <br /> 37 the same tester thst ran the original acceptance sample. The <br /> ! 38 challenge sample will be tested for a complste gradation analysis and <br /> I39 asphalt binder content. <br /> 40 <br /> I 41 The results of the challenge sample will be compared to the original <br /> 42 results of the acceptance sample test and evaluated according to the <br /> 43 following criteria: <br /> 44 <br /> I 45 Deviation <br /> 46 iJo. 4 sieve and larger t4 percent <br /> 47 No. 6 sieve to No. 80 sieve t2 percent <br /> I 48 No. 100 and No. 200 sieve t0.4 percent <br /> 49 Asphalt binder% t0.3 percent <br /> 50 <br /> IPort o(Everett FAWAT-03-03i <br /> Satellite RaillBarge Transkr F�-ility Final Port Revlaw Draft <br /> � Phase 1:Pier Constructlon 81 7!Maroh ZOOS <br />