My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> , <br /> I1 o Impact driving of steel Files allowed in thP dry, subject to the <br /> 2 preceding condition re. forage fish spawn. <br /> � 3 . Januaryl through February 15— vbratory installation of piles allowed. <br /> 4 Impact driving of concrete piles allowed with the following conditions: <br /> 5 o Prior measurements of pile driving noise have shown that the <br /> � 6 noise level at the nearest active eagle nest will be less than 80 <br /> ? dBA(Lmax), or <br /> � 8 o Eagle nest within 0.5 miles of work site is not active i.e., no eagles <br /> 9 are in the nest, the nest tree, or the nesting territory' ba�ed on <br /> I10 munitoring three times per week for 4 hrs (between 9 am and 3 <br /> 11 pm) per day, during the 7 days preceding the start of pile driving <br /> 1� and during each week in which impact pile driving occurs. <br /> 1 13 o No work or the beach, or pile driving landwa�d of—2 feet MLLV1' is <br /> l 14 allowed. <br /> 15 • February 15 through June 30—No in-water work allowed. <br /> I 16 <br /> 17 Construction Phases <br /> 18 The Construction Phasing descriptions illustrate the progressicn of construction in three <br /> ! 19 phases: 1, 2, and 3. The timing of the construction phases is driven by the in-water <br /> � 20 construction window and public access. Construction shall be planned and shall <br /> 21 progress in general order of these three construction phases. Contractor may propose to <br /> � 22 conduct certain elements of construction in a different construction phase, subject to <br /> 23 approval of the Engineer. <br /> 24 <br /> � 25 Following is a summary of the construction phases of this contract. Construction <br /> 26 elements indicated below are not all-inclusive and may not be presented in sequential <br /> 27 order of construction. <br /> 28 <br /> + 29 Phase 1 Pre in-water work construction <br /> 30 1. phase 1 road <br /> 31 2. temporary public access construction <br /> � 32 <br /> 33 Phase 2 (Including elem�nts subject to in water work restrictions)) <br /> 34 Elements of Construction <br /> I 35 1. pier construction <br /> 36 2. beach restoration construction <br /> 37 3. grading <br /> � 38 <br /> 39 Phase 3 <br /> 40 Elements of Construction <br /> � 41 1. phase 2 road construction <br /> 42 2. landscaping <br /> 43 3. rail construction <br /> I 44 <br /> 45 Minimum Traffic Lane Widths <br /> 46 A minimum exit lane width of 11.00 feet is required for any and all temporary traffic <br /> � 47 control arrangements. <br /> 48 <br /> Port of Evemtt FAWAT-03-039 <br /> Satellite RaillBarge Transfer Facilib: Final Part Review DreR <br /> Phase 1:Pier�onstruction 3 15 Mareh 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.