Laserfiche WebLink
i <br /> , <br /> I1 o Impact driving of steel Files allowed in thP dry, subject to the <br /> 2 preceding condition re. forage fish spawn. <br /> � 3 . Januaryl through February 15— vbratory installation of piles allowed. <br /> 4 Impact driving of concrete piles allowed with the following conditions: <br /> 5 o Prior measurements of pile driving noise have shown that the <br /> � 6 noise level at the nearest active eagle nest will be less than 80 <br /> ? dBA(Lmax), or <br /> � 8 o Eagle nest within 0.5 miles of work site is not active i.e., no eagles <br /> 9 are in the nest, the nest tree, or the nesting territory' ba�ed on <br /> I10 munitoring three times per week for 4 hrs (between 9 am and 3 <br /> 11 pm) per day, during the 7 days preceding the start of pile driving <br /> 1� and during each week in which impact pile driving occurs. <br /> 1 13 o No work or the beach, or pile driving landwa�d of—2 feet MLLV1' is <br /> l 14 allowed. <br /> 15 • February 15 through June 30—No in-water work allowed. <br /> I 16 <br /> 17 Construction Phases <br /> 18 The Construction Phasing descriptions illustrate the progressicn of construction in three <br /> ! 19 phases: 1, 2, and 3. The timing of the construction phases is driven by the in-water <br /> � 20 construction window and public access. Construction shall be planned and shall <br /> 21 progress in general order of these three construction phases. Contractor may propose to <br /> � 22 conduct certain elements of construction in a different construction phase, subject to <br /> 23 approval of the Engineer. <br /> 24 <br /> � 25 Following is a summary of the construction phases of this contract. Construction <br /> 26 elements indicated below are not all-inclusive and may not be presented in sequential <br /> 27 order of construction. <br /> 28 <br /> + 29 Phase 1 Pre in-water work construction <br /> 30 1. phase 1 road <br /> 31 2. temporary public access construction <br /> � 32 <br /> 33 Phase 2 (Including elem�nts subject to in water work restrictions)) <br /> 34 Elements of Construction <br /> I 35 1. pier construction <br /> 36 2. beach restoration construction <br /> 37 3. grading <br /> � 38 <br /> 39 Phase 3 <br /> 40 Elements of Construction <br /> � 41 1. phase 2 road construction <br /> 42 2. landscaping <br /> 43 3. rail construction <br /> I 44 <br /> 45 Minimum Traffic Lane Widths <br /> 46 A minimum exit lane width of 11.00 feet is required for any and all temporary traffic <br /> � 47 control arrangements. <br /> 48 <br /> Port of Evemtt FAWAT-03-039 <br /> Satellite RaillBarge Transfer Facilib: Final Part Review DreR <br /> Phase 1:Pier�onstruction 3 15 Mareh 2005 <br />