My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
! <br /> � <br /> I 1 Submittals <br /> 2 The Contractor shali submit an approved Work Plan for each construction phase, as <br /> � 3 defined in the Special Provision WORK PLAN, prior to commencing work on a given <br /> 4 construction phase. The Contraclor shall notify the Engineer in writing five (5) working <br /> 5 days prior to the Contractor's intention to commence work on a given phase of <br /> � 6 construction. <br /> i, 7 <br /> ' 8 PUBLIC ACCESS <br /> I9 Descriptior� <br /> ' 10 The Coniractor shall maintain public access to the site during Phase 2 and 3 <br /> 11 constructions in accordance with the Plans and thesz Special Provisions. <br /> � 12 <br /> � 13 Access Requirements <br /> 14 The existing public access to the project site shall be maintained through Phase 1 <br /> � 15 construction during daylight hours daily. After completion of the temporary public access <br /> 16 construction, approval of the Engineer, and the slart of Phase 2 construction, the <br /> 17 Contractor shall ciose access to the existing Fublic access area and open the temporary <br /> I 18 public access area iuring daylight hours :;aturday, Sunday and Holidays. The <br /> 19 Contractor shall prohibit public access to th2 temporary public access area at other <br /> 20 times. The Contractor shall also prohibit public access to the existing public access area <br /> � 21 during Phase 2 and Phase 3 construction. <br /> 22 <br /> 23 Public access to the existing public access area sh�ll be reopened prior to issuance of <br /> � 24 substaniial completion. The Contractor shall notify the Engineer in writing five (5) <br /> 25 working days prior to the Contractor's intention to reopen the existing public access <br /> 26 area. <br /> i 2� <br /> � 28 WORK PLAN <br /> � 29 Description <br /> 30 The Contr��tor shall submit to the Engineer a Work Pian where called for in the Plans <br /> 31 and Special Provisions. The Work Plan shall be submitted 10 calendar days prior to the <br /> 32 start of work for each construclion phase, as well as individual items of work, unless <br /> � 33 otherwise indicated. <br /> � 34 <br /> 35 The purpose of the Work Plans is lo identify potential problems and propose solulions so <br /> ! 36 that the Contractor will have an orderly operation. <br /> 37 <br /> 38 Contractor's Construction Schedule <br /> 35 As described in PROGRESS SCHEDULES. <br /> 40 <br /> 41 Work Plan i2equirements <br /> 42 Following are minimum requirements of the Work Flan� <br /> � 43 <br /> 44 1. The Work Plans shall be in writing with atlached drawings, charts, diagrams and <br /> t 45 re(erences to the Plans and Progress Schedule as necessary; and si�ail explain <br /> ; 46 the Contractor's preposed method for the prosecution of the Work within the <br /> 47 conditions and restrictions, as described in CONSTRUCTION PHASING, and this <br /> 48 conlract. <br /> � Port of Everell FAWAU03•039 <br /> Satellite RalllBarge Transfer Facllity Final Port Review Dratt <br /> Phase 1:Pier Construction 4 15 March 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.