Laserfiche WebLink
! <br /> � <br /> I 1 Submittals <br /> 2 The Contractor shali submit an approved Work Plan for each construction phase, as <br /> � 3 defined in the Special Provision WORK PLAN, prior to commencing work on a given <br /> 4 construction phase. The Contraclor shall notify the Engineer in writing five (5) working <br /> 5 days prior to the Contractor's intention to commence work on a given phase of <br /> � 6 construction. <br /> i, 7 <br /> ' 8 PUBLIC ACCESS <br /> I9 Descriptior� <br /> ' 10 The Coniractor shall maintain public access to the site during Phase 2 and 3 <br /> 11 constructions in accordance with the Plans and thesz Special Provisions. <br /> � 12 <br /> � 13 Access Requirements <br /> 14 The existing public access to the project site shall be maintained through Phase 1 <br /> � 15 construction during daylight hours daily. After completion of the temporary public access <br /> 16 construction, approval of the Engineer, and the slart of Phase 2 construction, the <br /> 17 Contractor shall ciose access to the existing Fublic access area and open the temporary <br /> I 18 public access area iuring daylight hours :;aturday, Sunday and Holidays. The <br /> 19 Contractor shall prohibit public access to th2 temporary public access area at other <br /> 20 times. The Contractor shall also prohibit public access to the existing public access area <br /> � 21 during Phase 2 and Phase 3 construction. <br /> 22 <br /> 23 Public access to the existing public access area sh�ll be reopened prior to issuance of <br /> � 24 substaniial completion. The Contractor shall notify the Engineer in writing five (5) <br /> 25 working days prior to the Contractor's intention to reopen the existing public access <br /> 26 area. <br /> i 2� <br /> � 28 WORK PLAN <br /> � 29 Description <br /> 30 The Contr��tor shall submit to the Engineer a Work Pian where called for in the Plans <br /> 31 and Special Provisions. The Work Plan shall be submitted 10 calendar days prior to the <br /> 32 start of work for each construclion phase, as well as individual items of work, unless <br /> � 33 otherwise indicated. <br /> � 34 <br /> 35 The purpose of the Work Plans is lo identify potential problems and propose solulions so <br /> ! 36 that the Contractor will have an orderly operation. <br /> 37 <br /> 38 Contractor's Construction Schedule <br /> 35 As described in PROGRESS SCHEDULES. <br /> 40 <br /> 41 Work Plan i2equirements <br /> 42 Following are minimum requirements of the Work Flan� <br /> � 43 <br /> 44 1. The Work Plans shall be in writing with atlached drawings, charts, diagrams and <br /> t 45 re(erences to the Plans and Progress Schedule as necessary; and si�ail explain <br /> ; 46 the Contractor's preposed method for the prosecution of the Work within the <br /> 47 conditions and restrictions, as described in CONSTRUCTION PHASING, and this <br /> 48 conlract. <br /> � Port of Everell FAWAU03•039 <br /> Satellite RalllBarge Transfer Facllity Final Port Review Dratt <br /> Phase 1:Pier Construction 4 15 March 2005 <br />