My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> I1 "Prime Coat Aggregate", per cuhic yard, or per ton. <br /> 2 The unit contract price per cubic yard or per ton for "Prime Coat Agg." shall be <br /> � 3 full pay for fumishing, loading, and hauling aggregate to the plare of deposit <br /> 4 and spreading the aggregate in the quantities required by the Engineer. <br /> 5 "Asphalt for Fog Seal", per ton. <br /> � � <br /> 7 The unit contract price F�er ton for"Asphalt for Fog Seal" shall be full pay for all <br /> 8 costs of material, labor, !ools, and equipment necessary for the application of <br /> 9 the fog seal as specified. If there is no bid item and a fog seal is required, it <br /> f 10 shall be applied and the work shall be included in the unit contract prices of the <br /> � 11 other work items. <br /> 12 <br /> 1 13 "Longitudinal Joint Seal", per linear foot. <br /> � 14 The unit contract price per tinear foot for "Longitudinal Joint Seal" shall be full <br /> 15 payment for all costs incurred to perform the wnrk described in Section 5- <br /> � 16 04.3(11). <br /> 17 <br /> 18 "Planing Bituminous PavemenY', per sq�are yard. <br /> � 19 The unit contract price per square yard for "Planing Bituminous PavemenY' <br /> � 20 shall be full payment for all costs incurred to pertorm the work described in <br /> 21 Section 5-04.3(14). <br /> 22 <br /> I 23 "Temporary Pavement Marking", per linear toot. <br /> 24 Fayment for"Temporary Pavement Marking" is described in Section 8-23.5. <br /> 25 <br /> � 26 "Removing Temporary Pavement Marking", per linear foot. <br /> 27 Payment for "Removing Temporary Pavement Marking" is described in Section <br /> 28 8-23.5. <br /> � z9 <br /> 30 "Water", per M gallon. <br /> 31 Payment for"Water" is descri�ed in Section 2-07.5. <br /> � 32 <br /> 33 "Anti-Stripping Additive", by calculation. <br /> 34 "Anti-Stripping Additive" will be paid for in accordance with Section 1-09.6 <br /> 35 except that no overhead, profit or othar costs shall be allowed. Payment shall <br /> 36 be made only for thn invoice cost of the additive. The quantity of asphalt binder <br /> 37 shall not be reduced by lhe quantity o( anti-stripping additive used. For the <br /> 38 purpose of providing a common proposal for ali bidders, the Contracting <br /> 39 Agency has entered an amount in the proposal to become a part of the total bid <br /> 40 by the Conlractor. <br /> � 41 <br /> 42 "Job �1ix Compiiance Price Adjustment," by calculation. <br /> 43 "Job Mix Compliance Price AdjustmenY' will be calculated and paid for as <br /> 44 described in S=ction 5-04.5(1)A. <br /> I45 <br /> _ 46 "Compaction Price Adjustment," by calculation. <br /> 47 "Compaction Price Adjustment" wiil be calculated and paid for as described in <br /> 48 Section 5-04.5(1)B. <br /> 49 <br /> Port o1 Everett FAWAT•03-038 <br /> Satellite Rali/Barge Transter Facility Final Port Review Draft <br /> IPhase 1:P(er Conslruction 72 75 March 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.