Laserfiche WebLink
i <br /> POTEN'I7AL IMPACfS <br /> I <br /> i <br /> 'Ihe propoud master plan prepared by Kegel and Associates, Ina indicates grading <br /> and filling the parttl to provide a gently sloping, relatively Oat building site. 'iliis <br /> aaiviry would require clearing and greding that urould result in the loss of about five <br /> acres ot upland forest Clearing and grading also would result in the partial loss ot <br /> the isolated scrubshrub wetland, totaling 6,720 aquare feet (0.15 acres). Dur'ng <br /> rnnstruqion bare soil would be expoud to sudace mnoff and could rosult in erosion <br /> and subsequent udinientation in Nonh CYeek. Cunstruction impacts would occur <br /> mer a relatively shon time freme and are mnsidered temporary. Construction and <br /> ! long-term permanent impacts can be avoided, reduad and compensated by <br /> implementing specific mitigating measures. <br /> i <br /> I <br /> I <br /> I <br /> � <br /> I <br /> I <br /> � <br /> � <br />