My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4027 4TH ST SE 2018-01-01 MF Import
>
Address Records
>
4TH ST SE
>
4027
>
4027 4TH ST SE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 9:12:57 AM
Creation date
3/8/2017 12:05:06 AM
Metadata
Fields
Template:
Address Document
Street Name
4TH ST SE
Street Number
4027
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
935
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Staff Reporl <br />2. �iological Evaluation (includes Sile and Landscape Plans) <br />3. Final Determination of Non-Significance <br />�1. Shoreline Master Program Regulations <br />Su'�s��quent to the hearing, al the request of lhe �iearing Examiner, ihe following exhibit <br />wa� submitied and admitled as part of the official record of these proceedings: <br />5. Letter lo Hearing Examiner from Steve Ingalsbe, Planning Deparlment, dated <br />December 21, 2004 re: revised proposed condition #10 and revised language in <br />Staff Report (exhibit 1), page 5, Seclion C- Public Access Element, Response lo <br />item #2. <br />All of ihe exhibils are available for inspection at the Hearing Examiner's Office located at <br />2930 Wetmore Avenue, 8th (loor, Everett, V��ashington. <br />After due consideration of the testimony and evidence presented by the Applicant and <br />tesiimony and evidence elicited during ihe public hearng, the following Findings of Fact <br />and Conclusions constitute lhe basis of the decision of the Everett Hearing Examiner. <br />FINDINGS OF FACT <br />The Applicant requested approval of a Shoreline Permit for the improvemenls to <br />lhe Water Pollulion Control Facility (WPCF) at 4027 — 4'�' Slreel SE, Everett, <br />Wash�ngton. The improvements include the following: <br />1) The current water chlorination sysiem will be reconstrucled lo allow the use <br />of a.8% hypochlorite solution in piace of ihe current chlorine gas. All <br />modifications required for lhis will occur within lhe footprint of the exisling <br />chlorination buildings (#1 & 2 on the site plan). <br />2) The primary biofiller (#6 on lhe site pian) will be updated to improve filtering <br />efficier.cy and plant capacily. The existing slructures thal currently house the <br />lrickle fillers will be gutled and the new systems conslrucled enlirely within <br />the existing footprint. <br />3) The new siphon headworks (#3 on lhe sile plan) will be installed within an <br />existing building. There will be no aiteration in the footprint of that building. <br />The siphon headworks are located on the opposite (west) side of the <br />Snohomish River and represent the only work proposed in this aclion on that <br />side oi lhe river. <br />�#) The headworks/splitter box (#5 on ihe site plan) will be installed wilhin an <br />existing utility cabinet. There will be no alteration in the footprint of the <br />cabinet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.