Laserfiche WebLink
Maltby Tank & Barge <br />Rezone 3-84 <br />Page -9- <br />Section 3 (A) 4 should read as follows: <br />4. No dir9ct access from the structures to be developed on <br />the southern portion of the proposed rezone shall be <br />allowed onto Lenora Street.. Access on-0 Lenora Street <br />will be limited to the alley. <br />Section 4 (B) 6 should read as follows: <br />6. All site drainage must be tightlined to the existing <br />open ditch drainage system. <br />Section 8 (E) should read as follows: <br />E. Performance guarantees are required for street, alley, <br />utility and landscaping improvements. At least 10% <br />setoffs shall be required for such guarantees. <br />Entered this 1st day of June, 1984, pursuant to the authority <br />granted under Ordinances 819-81, 823-81 and 952-83 of the City <br />of Everett Zoning Code. <br />mes M. Driscoll <br />NOTICE <br />You are hereby given notice that pursuant to RCW Section <br />35.63.130 the foregoing Findings, Conclusions and <br />Recommendataions have been submitted to the Mayor and City <br />Council of the City cf Everett, Washington, for their <br />consideration and approval. <br />Council action on this item will occur at a later date, of <br />which you will be notified by mail. <br />PROCEDURE FOR RECONSIDERATION <br />All motions for reconsideration of specific items or omissions <br />may be made in writing to the Hearing Examiner within ten (10) <br />calendar days from the date of these recommendations. The <br />final date for :notion for reconsideration is 5:00 p.m. on June <br />15, 1984. <br />