My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1918 WALL ST 2018-01-02 MF Import
>
Address Records
>
WALL ST
>
1918
>
1918 WALL ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2022 11:40:40 AM
Creation date
3/8/2017 1:26:51 PM
Metadata
Fields
Template:
Address Document
Street Name
WALL ST
Street Number
1918
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
769
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
in the const:uction of the City's new sewer main; the proper costs <br />thereof to be borne by the County. <br />3. PRESUMPTIONS OF THIS uNO.RST NDIN•, Parties to this Memorandum <br />anticipate that: <br />A. Water usage at the new County jail will approximate <br />gallons per day and that such usage, together with storm <br />runoff, will require a sewer sub -main of approximately 8' • <br />diameter. <br />B. The sub -main would be constructed in Wall Street from the <br />• <br />eastern half of Block 71.4 to the northerly extension of the <br />north -south alley in Block 713, this distance being <br />approximately 275 feet. <br />C. Construction costs of the sub -main will be approximately $100 <br />per lineal foot, inclusive of street restoration, leading to a <br />preliminary construction cost estimate of $27,500. <br />P, The County's portion of construction costs will be separated <br />from costs of the City's work by suitable bid alternates or <br />other appropriate means. <br />E. The County will reimburse the City for its costs in designing <br />and inspecting the County's portion of the work. Costs in <br />each of these categories may be expected to approximate lot of <br />construction costs. <br />F. Contracts awarded by the City will incorporate those <br />rquirements of the RCW and WAC applicable to jail projects <br />funded under Chapter 289-13 WAC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.