Laserfiche WebLink
Snohomish County Public Works Dept. <br />SPU 116-81 <br />Page -4- <br />14. There will be extensive pedestrian traffic in the area. In order to improve <br />the pedestrian movement and meet the City of Everett standards, the <br />existing sidewalks around the perimeter of the development must be <br />improved. All existing driveway aprons that will no longer be used shall be <br />replac--d with full curbs and sidewalks to match tite existing sidewalks. <br />15. The traffic circulation for the parking lot of the proposed Jail has been <br />revised since the initial approval of the Special Property Use Permit. As <br />proposed in the final plans, there will be a traffic flow system that will allow <br />egress onto Wall Street. Ingress to the lot will be off of Oakes and traffic <br />may exit onto Oakes. The ..lain reason for this change was for fire safety <br />purposes. <br />16. The proposed Jail will be situated adjacent to other governmental buildings in <br />the area. <br />17. The proposed new Jail and Work Release Facilities will relieve overcrowding <br />conditions in the existing Jail. <br />18. The Everett Planning Department has recommended final approval of the <br />Special Property Use Permit for the construction of the Snohomish County <br />Jail subject to the following conditions. <br />1. All conditions contained in Special Property Use Permit If6-81 are <br />hereby reaffirmed. <br />2. That the sewer serving the jail site must be upgraded to Public Works <br />Department standards. <br />3. The Applicant must comply with the requirements of the Sewer <br />Interceptor Ordinance in effect at the time of Buildinj; Permit issuance. <br />4. On -site detention will not be required. In lieu of on -site detention, <br />payment will be made to the Regional Detention Fund No. 340. The <br />amount required will be based on drainage calculations as required by <br />the Public Works Department when design and development plans are <br />finalized. <br />5. The existing north -south alley must be maintained by easement or <br />within the existing alley right-of-way and will have to be vertically <br />realigned to handle increased traffic from this development. (15% slope <br />maximum.) The existing grade differential at Wall Street is excessive <br />from a traffic safety view. <br />6. Existing sidewalk around the perimeter of development on the block., <br />must be brought up to standards, which will require replacement of all <br />broken or depressed sections. <br />