My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2522 RUCKER AVE 2018-01-01 MF Import
>
Address Records
>
RUCKER AVE
>
2522
>
2522 RUCKER AVE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2019 8:57:37 AM
Creation date
3/8/2017 9:01:48 PM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
2522
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/14/88 ��� <br /> Mr. Tony Lee D � v � u `� �� <br /> Associate Engineer, Public Works <br /> City of Everett ��}N 2 6 1998 <br /> 3200 Cedar Street <br /> Everett, WA 98201 �.TY pF �VERETT <br /> Sub)ect: Bey Side Condominlums Plan Revlew Requlrements <br /> permit Services <br /> Plan Check No. B 57437 <br /> Dear Tony, <br /> Thank you [or meeling with us to go over the list of review questions you have <br /> concerning the above noted pro�ect. I will follow your Ifst responding item by item. <br /> NON STRUCTURAL ' <br /> O�n�ral <br /> The plans as submitted are incomplete. Additional comments may be required upon <br /> ft:rther review of subsequent submittals. If all comments are not satisfied by the end of <br /> the next submittal, an additional plan review fee per Section 107.2 will be <br /> assessed. Note that the comments of the cursory plan review letter of Marcli 16, <br /> 1998 of which were either not addressed or were insufiicient in reply have been listed <br /> again for compliance. <br /> 2. Based on the request for an expedited plan review, and the breadth and depth of <br /> comments, this n�n-structural portion of the review has been forwarded before the <br /> structural portion of review has been staRed. The structural plan review can only <br /> begin once the non-structural issues have been addressed. � <br /> 3.The following design/build systems are submitted and approved as deferred <br /> submittals provided the comments noted per this review are satisfied: Mechanical, <br /> Plumbing, Electrical and Fire Sprinkler Protection. Section 106.3.4.2 <br /> 4.The door and hardware schedule provided has proven very difficult to locate <br /> appropriate doors quickly and accurately, and does not paraliel industry standards. It <br /> is strongly suggested that each door shown be provided with a number that <br /> corresponds with a door number on the door schedule, and not be arranged by room <br /> 101 WEST h1AIN STREET � %,,�'�p.g�p55. p} �� <br /> Monme.N'a�Aln�bn B��iTi US� �����gp'7g;:�'J�iz <br /> ��11P��"�CI�RIO�D�Cf ICR�PflICD�G1161�C�PEDfS�I,aRCHfTECTURE IY�SI�IP�'�'61l'II�IOkDB�VI��PNCD�h'IW�'�BDB�' <br />
The URL can be used to link to this page
Your browser does not support the video tag.