My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1707 SCENIC DR SNO CO PUD 2018-01-02 MF Import
>
Address Records
>
SCENIC DR
>
1707
>
SNO CO PUD
>
1707 SCENIC DR SNO CO PUD 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2020 2:57:05 PM
Creation date
3/9/2017 1:58:34 AM
Metadata
Fields
Template:
Address Document
Street Name
SCENIC DR
Street Number
1707
Tenant Name
SNO CO PUD
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Puget Sound Power.& Light Co. <br />Special Property Use Permit 16-84 <br />Page -4- <br />5. in order for a Special Property Use Permit to be granted <br />within the City of Everett, the criteria as set forth in <br />Section 19.58.010(B) must be met. That criteria include: <br />A. The proposed use must be reasonably compatible <br />with other uses and potential uses within the <br />general area in whi�h the use is proposed to be <br />located; <br />B. <br />C. <br />The use must not have a serious adverse effect on <br />the ecology and/or enviconment of the community; <br />and, <br />The use must serve the public cnnvPnience and <br />necessity. <br />6. Phe surrounding properties have the following land use <br />and zoning designation: <br />north: Single Family/R-1; south: Single Family/R-1; <br />east: Vacant/R-1; west: Business/R-1 <br />7. Cuccently on <br />Substation. <br />lattice steel <br />the Applicant <br />facility with <br />lattice steel <br />tubular steel <br />the subject property is the Bevecly Park <br />It is a three story structure with a <br />switching facility. It is the proposal of <br />to replace the three story structure <br />a one story stcucture and replace the <br />switching facility with a less obtrusive <br />structure. <br />8. A conceptual site plan of the ptoposed development was <br />submitted by the Applicant and was admitted at the <br />hearing as Exhibit i4. A copy of the site plan is <br />attached hereto and by this reference is hereby <br />incorporated as part of these findings. <br />9. Originally the Beverly Park Substation was the major <br />transmission substation in the Applicant's Everett <br />district and was the receiving station for powPr <br />genecated at Baker River and the Rock i�land <br />Hydroelectric project. After the Snohomish County PUD <br />was formed and the Bonneville Power Administration <br />transmission developed, the substation became the <br />intertie point between the Applicant's northern and <br />north central divisions as well as an interconnection <br />point between the PUD and the BPA systems. <br />
The URL can be used to link to this page
Your browser does not support the video tag.