My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1707 SCENIC DR SNO CO PUD 2018-01-02 MF Import
>
Address Records
>
SCENIC DR
>
1707
>
SNO CO PUD
>
1707 SCENIC DR SNO CO PUD 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2020 2:57:05 PM
Creation date
3/9/2017 1:58:34 AM
Metadata
Fields
Template:
Address Document
Street Name
SCENIC DR
Street Number
1707
Tenant Name
SNO CO PUD
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Puget Sound Power a Light Co. <br />Special Property Use Permit 16-84 <br />Page -11- <br />41. A witness (Betker) submitted that a fence on the east <br />end of khe subject property should be provided so that <br />access to Grant Street can be had. Further the witness <br />submitted that the Applicant should consider filling the <br />ditch on the south side of the subject property in order <br />to make the chainlink fence more effective in keeping <br />out children. <br />42. The Applicant submitted that currently there is access <br />to Grant Street from the site and after the fence is <br />developed there will still be the same access. Thus, <br />according to the Applicant, no gate is needed. <br />43. No other testimony was received. <br />CONCL••JS I ONS <br />1. The application is for the aoproval of a Special <br />Property Use Permit to allow the rebuilding of the Puget <br />Power Substation in two phases over a five year period; <br />and, for a variance to allow a seven foot high chainlink <br />fence with barbed wire within the front and south <br />sideyards. The Special Property Use Permit and the <br />variance were requested for proper�y owned by the <br />Applicant at 1707 Scenic Drive. <br />2. in order for a Special Property Use Permit to be granted <br />the criteria as set forth in Section 19.58.010(B) 1-3 <br />must be met. The application does meet the criteria. <br />3. Phase i of the proposed project is the construction of a <br />new 1,600 square foot control house and the demolition <br />of the existing control house, and, Phase II is the <br />construction of 115 kV switching facility on the <br />westerly portion of the fenced area of the subject <br />property. They are compatible with the exising uses. <br />The construction will result in a smaller control house <br />and a lessening of the size of the dead-end towers on <br />site and will be more aesthetically pleasing. <br />4. With proper controls, noise and garbage will not be a <br />problem with the proposed Special Property Use Permit. <br />5. The proposed Special Property Use Permit will not have <br />an adverse impact on the environment and a Declaration <br />of Non-Significance has been issuad. <br />6. There is a need for the requested Special Property Use <br />Permit because it will provide more effective electcical <br />services to the general vicinity of the City of Everett. <br />
The URL can be used to link to this page
Your browser does not support the video tag.