My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6920 SEAWAY BLVD 2018-01-01 MF Import
>
Address Records
>
SEAWAY BLVD
>
6920
>
6920 SEAWAY BLVD 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 3:25:24 PM
Creation date
3/9/2017 5:32:17 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
6920
Imported From Microfiche
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1015
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,. <br /> II-13-d In conjunction wi[h Phase I development an extension of 20th Avenue West <br /> to a point Pain closercotoperati n iCh the Ci[ylEn�ineeringeandtTrafficof <br /> the property <br /> Dep;rtments. <br /> II-13-f Traffic hazards may inerease due to the increa�ed vehicular traffic <br /> noted above. <br /> II-14-a Our Proposal will have an effect on the City of Everet[ Fire Department <br /> add at leasta338t400 square feet1oflareaftoubepprotected,19R0, we wi11 <br /> It should be noted that all oi our buildings will be completely pro[ected <br /> by apptoved fire sprinkler systems and hourly security patrols throughout <br /> each building to provide early warning alarms• <br /> It alsc should be pointed out that our in-house fire alert training of <br /> key personnel will continue. Our opera[ions are not of a hazardous <br /> nature and our past experience relatin� to fire hzs been excellent. <br /> II-14-b The Police De�+artmen[ will be afferted by the increasefi area to cover and <br /> by 1980 an increased population of 595 people under their jurisdiction. <br /> assistanceewillibecrequiredlinbtraffictrelated inciden[sity of Police <br /> The Fluke Company has a policy of employing our ovn internal securitv <br /> force [o maintain surveillance of the property on a 24 hour basis, <br /> as well as identifying a Fluke employee to coordinate all securicy efforts. <br /> It is our intent tc address the problemotentialutrouble areasesign stages <br /> of our Business Park to eliminate any p <br /> II-14-d Local recreational facilities may be impacted by [he daily use of such <br /> things as tennis co�r[s, etc. Hoiaever, it is the intent of our Company <br /> to include recreational facilities within the confines of �ur Business <br /> Park, although these facilities•are not included in Phase I. <br /> In conjunction with future a� .alopment phases, we are considering the <br /> establishment of a complete gym facility along with tennis courts, <br /> joggi.ng trails, bike paths, e[c. This idea w111 be pursued during the <br /> developmen't of the long range plan for the site and �aill depend on <br /> business conditions and employee response. <br /> Increased road maintenance should be expected upon [he compleeion of <br /> II-14-e . <br /> Phase I of the pro;ect. In conjunction with Phase I developnent, a <br /> extensionthe p�resenteownereof theaptopertyain closercrooperation witheing <br /> built by I <br /> the City Engineering and Traffic Departments. <br /> Contac[ has been made with the Washington Natural Gas Company as to ( <br /> II-16-a 1 in the development. A Mr. Wolfe of the Techni- � <br /> its capaMlity of supp y S teconfirmed that gas is available <br /> cal Services Department of that Company <br /> in the area. M original letter dated March 20, 1974, from the Chief <br /> Engineer, Mr. Olson, in rc��onse to the "Commerce Wocld" EIS , stated <br /> that gas would be availabl.e to the development. <br /> . -7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.