Laserfiche WebLink
INTEGRUS <br />A R C H I T E C T U R E <br />July 27, 2007 <br />Trinity Lutheran College <br />Port Gardner Buildine Renovation <br />QUA II-Ca5 <br />Re: Trinity Lutheran College at Port Gardner Building <br />Pre -Application conference, dated 711712007 <br />Meeting Notes <br />Attendees: <br />Benyam Stephanos, Development & Permits, Klaus Janssen, Fire Inspector <br />Kirk Brooks, Building Official Michael Brick, Traffic Engineering <br />Faheem Siddiq, City Planner <br />Kirk Robinson, Robinson Company Larry Hurlbert, Integrus Architecture <br />Todd Nelson, Kirtley Cole Jeff Middelton, Integrus Architecture <br />Zoning: <br />• No issues. <br />• Historic designation: not federal register, City designation. Not affecting <br />current project. <br />• Rooftop equipment: needs to be properly screened only if new equipment <br />installed on roof. Not intended for minor small fans. <br />• Environmental review not required. No SEPA or Conditional Use Permits <br />required. <br />• The old theater area can be turned into a chapel/meeting area in the <br />future. <br />• There will not be any requirement for public art. <br />2. Building: <br />• Occupancy / Non -separated uses: check allowable height & stories for <br />Type II-B const,uction. May not be able to be considered all A-3. <br />Otherwise a 1 HR occupancy separation (sprinklered) between A-3 <br />Commons & B occupancy is required. <br />• Type of Construction: Existing under'94 UBC: Type II-F.R., under IBC ]I- <br />B. <br />• Adding elevator stop for service access (at loading area 5 feet above first <br />floor) would not trigger major upgrade requirements, such as <br />accommodating stretcher. <br />• The new kitchen will be a warming type, not a full prep kitchen. Type I <br />hood will be required if grease -laden vapors are produced (i.e. open <br />flame, fryer, grill). Needs shaft around exhaust duct. Exhaust fans <br />required to be 4' above roof and 10 feet from property line & ai, ,stakes. <br />o Type K extinguishers required <br />• Change of Use / safety upgrades: <br />o Agreed w/ Tony Lee that '94 structural design acceptable <br />o Still needs to be verified if all '94 structural design work was built. <br />Initial inspection appears OK some areas not accessible for <br />inspection until demolition done. <br />C3 <br />