Laserfiche WebLink
. ( ( <br /> � 4. Public Servica: <br /> (i) Adn+��ate�� S�ooiv: . <br /> Fin in • City water mains are located on Hardeson Road,Mertill Crak Parkway and <br /> Glenwood Avenue. Water mains must be extended through the site to service eact►of the lou <br /> with adequate average daily flows, peak flows and fire flows.Looped water systems must be <br /> installed on She site in accordance with City standards. Water systea►irt►Provemmu must be <br /> phased in a manner that provides adequate sesvice during each phase of development on the four <br /> lots. The fire flow requirement for the project will be determined when developments are <br /> proposed on the lots. The Southwest Everett Subarea Plan deterntined that water service could <br /> be provided to the subarea at 4,OQ0 gallon per acre per day,with a fire flow of 3,500 gallons per <br /> minute. Further analysis indicates that Lot 1 of this Binciing Site Plan can be served with 4,000 <br /> gallons per minute of fire flow without adversely affecting the remainder of the system. <br /> ['onclusion�: Adequate water supply wi11 be available to the new lots. <br /> �����.y,nfP w e Disuosal: <br /> Findin¢s: Public sewer mains exist on Hardeson Road,Merrill Creek Parkway and Glenwood <br /> Avenue. These facilities will he�•e to be extended through the to serve development of each <br /> , parcel. Sewer system improvements must be phased in a manner that pro�ides adequate service <br /> , during each phase of development on the four lots. The Southwest Everett Subarea Plan <br /> determined that sewer service could be provided to the subarea at 1,700 gallons per acre per day <br /> of average flow, and 4,000 gallon per acre per day of instantaneous peak flow or 2.7 gallons per <br /> acre per minute. Sewer service to Lots 1, 2 and 3 can be provided from the Hardeson Road line. <br /> Sewer service to Lot 4 will be detertnined at the time development or further land division is <br /> proposed. All connections must be made per City Standazds. <br /> ('onclusions: Adequate sewage disposal will be available to the new lots. <br /> ����� Anorooriate Storm Draina¢e Imorovements: <br /> Fin in • Drainage improvements are required on this site per the Stormwater Manual and the <br /> Design and Construction Standards and Specifications for Development. This includes on-site <br /> detention and water quality treatment facilities. Following on-site detention and water qualiry <br /> treatment, the stormwater wili be discharged to the appropriate drainage basin. Tlvee drainage <br /> basins extend onto the site: Mertill and Ring Creek, Glenwood, and Pigeon Creek No. 2. The � <br /> cotlected surface water exiting the property must be conveyed to the nearest established, stable <br /> drainage course,within the naturally occurring drainage basin. <br /> ('onclusions• Appropriate storm drainage improvements will be provided on the site. <br /> 3 3/q <br />