My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1001 SHUKSAN WAY 2016-01-01 MF Import
>
Address Records
>
SHUKSAN WAY
>
1001
>
1001 SHUKSAN WAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2017 7:37:09 PM
Creation date
3/9/2017 7:34:52 PM
Metadata
Fields
Template:
Address Document
Street Name
SHUKSAN WAY
Street Number
1001
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
565
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' -'\ <br /> . � � 1 <br /> (iv)sie�uate Fire Hydrants: <br /> ' din • City standards require a fire hydrant to be located within 200 feet of but no closer thu► <br /> t <br /> 50 feet all wmmercial scruccures. The Fire Marshal must approve the location of the hydranta u <br /> the time development is proposed on the lots. Water flow information and the numba of <br /> hydrants required will be detertnined when more detailed information is provided ! <br /> ['onclusions• Adequate 6re hydrants will be provided on the site at time of development of <br /> individual lots. <br /> (v) Ap�rooriate Access to all Mticioated Uses: <br /> i in : All of the lots will have frontage on Hazdeson Road, Sievers-Duecy Blvd., Glenwood <br /> Avenue, Memil Creek Parkway and/or"Commerce Way" when it is extended as part of tltis <br /> binding site plan. Further development or division of Lot 4 will likely require additionai intemal <br /> access roads. The SW Everett Mitigation Decision Document requires that a traffic study be <br /> completed for each development to address site access and safety issues. <br /> ('onclusions: All lots will have frontage on a publicly dedicated strcet. A traffic study is required <br /> for the total potential development of the binding site plan when the first application is submitted <br /> for a building permit. 'fye purpose of the study will be to address local access and safety issues <br /> for the entire project, including the need for a traffic signal at. <br /> (vi)�rqvision for All Aoorooriate Deeds.Pedications and/or Easements• <br /> Findin • Easements must be granted between lots where necessary to convey stormwater to <br /> stormwater facilities. <br /> ('onclusions: Appropriate provisions must be provided for easements between the lots. <br /> (vii)Exammation of existina streets and utilities and how the or000sttlbindin¢site ul�n relates to <br /> them: <br /> Findin s• All of the proposed lots would front on either Hardeson Road, Glenwood, Sievers <br /> Duecy Blvd., Merrill Creek Parkway or Commerce Way(proposed in this binding site plan). <br /> Sewer and water connections must be made to the City's public mains. <br /> Conclusions: Adequate streets and utilities are available to the site. <br /> 5. Environmental Issues - Examination of the project through the SEPA process and a <br /> determination of whether the proposed Binding Site Plan, site plan and other application <br /> information complies with the city's SEPA Ordinance, zoning code and comprehensive plan <br /> policies. <br /> 4 ��q <br />
The URL can be used to link to this page
Your browser does not support the video tag.