Laserfiche WebLink
, y p�,n, Aie, unicca�t tbhl <br /> csF �sics� • <br /> A STATION HUILOfNG <br /> Ala GroundFloor 12,00f1 223 f2,67Q,000 <br /> Alb Secmd Flooc 9,000 163 51,467,000 <br /> A2 Site work and Plaza 16,780 Z7 S�A� <br /> AutoDcopoff 8,38f2 17 51�3,000 _ <br /> Subtae�l 54,740.000 <br /> B BUSPLATFORMS <br /> BI El'(2) 15,400 28 5432.000 <br /> B2 C'C(8) 34.600 54 51.869.000 <br /> gg �p�2) 16,800 b0 51,008,000 <br /> B4 Inrerdty(5) 16.800 60 f1,008.000 <br /> Subrotal f4.317.000 <br /> C IWLPLATFORMS <br /> Cl RTA'Sounder'ComcnutetRail 12,000 58 S6%,000 <br /> C2 Amtrak 22,000 38 5836,000 <br /> Subrotal E1,532,000 <br /> D PARIQNG <br /> Dla North 54,600 15 5819,000 <br /> Dlb ShuttleDrop-oH 6,400 15 596,000 <br /> (Yt South(CommutecRail) 116,300 9•4 51,094,000 <br /> D3 Northwest 31,500 12 5378,000 <br /> p,� �t 112.000 12 f1,344.000 <br /> Subtotal ���1•� <br /> E S7REEiIh1PROVEM8N1'S <br /> Ela SmithAve.(32ndM34th) 1,055 LF 1,500 f1,583,�700 <br /> Elb Smith Ave. (34th to 35th) 360 LF 1.200 Sl32,000 <br /> E2 32ndStreet 670 IF 1,500 51,005,000 <br /> E3 33rd Sheet 83U LF 1,500 51,245,000 <br /> Subtotal �•�5,� <br /> TOTAL fiB,SeS,000 <br /> Total including['ublic Art A1lowance S1B.771,000 <br /> Total induding off site traEfic miHgation 520,066500 <br /> Alterc•,ates deduct Total <br /> 1 Singletevelstallonbuilding S1,d67,000 517,118,000 <br /> 2 Clocktower(freestanding) 5254,000 518,331,000 <br /> AssumpNons: <br /> . Includes 9%cost for genenl condiNons,5%conenccor OH&fee and <br /> 10%cantingmcy <br /> . Costs exalated to mid�construcdon in July.1999 <br /> • Excludes land�cquisieon,mvironment+l rcmediaHan,saln tax,track <br /> work;.4&E kes,permib,owner administntion cost,and ownei s <br /> project contingency <br /> • Art allo�.�antt is based upon upital conshvction cost(60°6)and <br /> ercludes consttucHon labor(30°�e)at this Hme <br /> (. 7/M <br />