|
, y p�,n, Aie, unicca�t tbhl
<br /> csF �sics� •
<br /> A STATION HUILOfNG
<br /> Ala GroundFloor 12,00f1 223 f2,67Q,000
<br /> Alb Secmd Flooc 9,000 163 51,467,000
<br /> A2 Site work and Plaza 16,780 Z7 S�A�
<br /> AutoDcopoff 8,38f2 17 51�3,000 _
<br /> Subtae�l 54,740.000
<br /> B BUSPLATFORMS
<br /> BI El'(2) 15,400 28 5432.000
<br /> B2 C'C(8) 34.600 54 51.869.000
<br /> gg �p�2) 16,800 b0 51,008,000
<br /> B4 Inrerdty(5) 16.800 60 f1,008.000
<br /> Subrotal f4.317.000
<br /> C IWLPLATFORMS
<br /> Cl RTA'Sounder'ComcnutetRail 12,000 58 S6%,000
<br /> C2 Amtrak 22,000 38 5836,000
<br /> Subrotal E1,532,000
<br /> D PARIQNG
<br /> Dla North 54,600 15 5819,000
<br /> Dlb ShuttleDrop-oH 6,400 15 596,000
<br /> (Yt South(CommutecRail) 116,300 9•4 51,094,000
<br /> D3 Northwest 31,500 12 5378,000
<br /> p,� �t 112.000 12 f1,344.000
<br /> Subtotal ���1•�
<br /> E S7REEiIh1PROVEM8N1'S
<br /> Ela SmithAve.(32ndM34th) 1,055 LF 1,500 f1,583,�700
<br /> Elb Smith Ave. (34th to 35th) 360 LF 1.200 Sl32,000
<br /> E2 32ndStreet 670 IF 1,500 51,005,000
<br /> E3 33rd Sheet 83U LF 1,500 51,245,000
<br /> Subtotal �•�5,�
<br /> TOTAL fiB,SeS,000
<br /> Total including['ublic Art A1lowance S1B.771,000
<br /> Total induding off site traEfic miHgation 520,066500
<br /> Alterc•,ates deduct Total
<br /> 1 Singletevelstallonbuilding S1,d67,000 517,118,000
<br /> 2 Clocktower(freestanding) 5254,000 518,331,000
<br /> AssumpNons:
<br /> . Includes 9%cost for genenl condiNons,5%conenccor OH&fee and
<br /> 10%cantingmcy
<br /> . Costs exalated to mid�construcdon in July.1999
<br /> • Excludes land�cquisieon,mvironment+l rcmediaHan,saln tax,track
<br /> work;.4&E kes,permib,owner administntion cost,and ownei s
<br /> project contingency
<br /> • Art allo�.�antt is based upon upital conshvction cost(60°6)and
<br /> ercludes consttucHon labor(30°�e)at this Hme
<br /> (. 7/M
<br />
|