My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
400 SMITH ISLAND RD 2018-01-01 MF Import
>
Address Records
>
SMITH ISLAND RD
>
400
>
400 SMITH ISLAND RD 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2019 10:57:02 AM
Creation date
3/9/2017 11:08:26 PM
Metadata
Fields
Template:
Address Document
Street Name
SMITH ISLAND RD
Street Number
400
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/ � `, <br /> lo) The applicant shall provide a continuous paved pedes- <br /> trian/bikeway adjacent to the main channel of the Snohomish <br /> River extending north to 12th Street N.E. and south to the <br /> southern terminus of the subject property. This trail system <br /> �� must be designed to Parks Department specifications. <br /> �) The City shall provide temporary erosion control in the form <br /> of bridging across all drainage ditches and by placement of <br /> - silt fences in and around drainage ditches as necessary to <br /> prevent drainage from the project site into adjacent ditches. <br /> Construction water shall be pumped into lagoons or settlement <br /> ponds. The City shall protect surrounding vegetation from <br /> erosion runoff from the construction area through the instal- <br /> lation of silt fences, hay bales, etc. between the construc- <br /> tion area and the surrounding vegetated areas. <br /> 12) No motor vehicle use is permitted including two or <br /> three-wheeled vehicles , on beaches, dunes, or fragile shore- <br /> line areas except for maintenance and preservation of public <br /> health and safety. <br /> 13 ) The applicant shall provide all necessary background informa- <br /> tion as required by the SCSMP landfill general regulation #3 <br /> (pp. F35 AND F36) <br /> 14) Piers hall be constructed in a manner consistent with the <br /> Snohomish County Shoreline Master Program and not extend into <br /> � the river more than 50 feet. <br /> 15) A sign plan must be submitted to the Planning Department for <br /> review and approval prior to installing any signs to assure <br /> compliance with the Shoreline Master Program sign regula- <br /> tions. <br /> 16) Water service satisfying all Fire Department requirements <br /> shall be provided. <br /> 17) Prior to construction, plans and specifications must be sub- <br /> mitted to the Snohomish Health District for review and ap- <br /> proval. <br /> 18 A Water quality Certification modification must be obtained <br /> from the Department of Ecology prior to construction. <br /> -2- <br /> v^ � � 1� � ��U-� <br /> . , y;� , t� I�l f�; � <br /> „ <br /> ; � � i� ,� <br /> � I� , , � ,� � �= °�- ��'%� � <br /> L� �,,- � • <br /> �,;; '� �`�;��i! ::.:� �� �� �,�li � � <br /> � <br /> k ' ��1 - �u. � �`C-l�j et� ' <br /> , ,�. , c�a �� <br /> �� � , �� � <br /> 3�fuv iva\,*�?� � � i��-�s�,�`: . .. �t <br /> 4��. . ..,i���r �- 1� <br /> i . . I'�1 <br /> 1 � <br /> A7'7'ACIR9IiN.0 "IS" <br />
The URL can be used to link to this page
Your browser does not support the video tag.