Laserfiche WebLink
January 28, 2010 14 093-93256.100 <br />a. Inspection date and time. <br />b. Wealher infortnalion: generel condilions dunng inspedion and approximate amounl of <br />precipitation since the last inspection and within ihe last 24 hours. <br />c. A iist o( all BMPs which have been implemented, inctuding observations of all erosionlsedimenl <br />control measures and 1 or practices. <br />d. The fo�lowing witl be noted: <br />i. Locations oi all BMPs inspeded <br />ii Locations of BMPs that need naintenance. <br />iii. The lype o( maintenance required and the reason why maintenance is needed. <br />iv. Locations o( BMPs that failed to peAorm as designed or intended. <br />v Located where additional or diHerent BMPs are needed and the reason(s) why. <br />e. A description of stormwater discharged from the site, including the presence of suspended <br />sediment, turbid water, discolora�ion, andlor sheen, as applicable. <br />t General commenls and notes, including a bnef description of any BMP repairs, maintenance, or <br />installations made as a result o( the inspection. <br />g. A statement that, in the jodgmenl of the inspector, the site is either in or out o( compliance with <br />lhe SWPPP. I( the site is judged to be out of compliance, the inspec6on report shall mdude a <br />summary of lhe remedial actions required to bring the site back into compliance, as well as a <br />schedule of implementati�n. <br />h Name, title, and signalure of the inspector, as well as the tollowing statement: "I certify that lhis <br />report is Irue, accurate, and complete to the best of my knowledge and beliel." <br />6.2 STORMWATER QUALITY MONITORING <br />Slormwater quality monitoring will be performed as part of the site monitoring acirvities under the NPDES <br />PermN, and specifically the requirements of Conddion St t wdl be implemented during cap construction if <br />water Is discharged through Outl211 #001. <br />