My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3501 SR 529 2016-01-01 MF Import
>
Address Records
>
SR 529
>
3501
>
3501 SR 529 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 8:11:25 AM
Creation date
3/10/2017 12:05:32 AM
Metadata
Fields
Template:
Address Document
Street Name
SR 529
Street Number
3501
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PORT OF EVERETT SECfION 00800 <br />UNION SLOUGH MARSH MITIGATION SUPPLEMENTARY CONDITIONS <br />5. Documents. Order of Preced n <br />These specifications, the drawings, general and supplemental conditions, and all <br />suppkmentary documents are essential parts of the Contract, and a requirement occurring <br />in one is as binding as though occurring in all. They are intended to be complementary <br />and to describe and ptovide for a complete work. <br />In cases of contlict in the requ'vements and provisions as set out by the Contract, the <br />specifications, or the drawings, such conflict shall be rcconciled by the acceptance of the <br />following order of precedence for the various Contract Documents. <br />a. <br />b. <br />c. <br />d. <br />e. <br />f. <br />B• <br />h. <br />Contract, the document bearing the signature of the PORT and the <br />CONTRAC:TI;R. ' � <br />Bid Proposal submitted by CONTRACTOR. <br />Addenda, �, usnul. <br />Supplerr�ntary Conditions. <br />Technical Specifications. <br />Drawings. <br />Inswctions to Bidders. <br />Gencral Conditions. <br />The appazent silence of the specifications and drawings as to any detailed or the appazent <br />omission from them of a detailed description concerning any point, shall be regazded as <br />meanin� that only the best general practice is to prevail and that only approved material <br />and workmanship of first quality are to be uscd. <br />6. Subconvactinc Portions of the Work <br />If any part of the work to be done under the Contract is subcontracted, the subcontracting <br />shall be done in accordanco with following provisions: <br />The apprarent successful low bidder shall, within one hour of the bid opening, submit to <br />the PORT a list of inechanical and electrical subcontractors for those portions of Work. <br />Such li�t shall be accompanied by an experience statement with pertinent information <br />regazding similar projects and other evidence of quali6cation for each such Subcontractor, <br />3uppGer, person or organization if requested by the Port. <br />The appazent successful Bidder shall also, within 24 hours after requested by the PORT, <br />submit to PORT a list of all such Subcontractors, Suppliers, and other persons and <br />organizations proposed for those portions of the work for which such identification is <br />required, Such list shall be accompanied by an experience statement with pertinent <br />information regarding similaz projects and other evidence uf qualification for each such <br />Subcontractor, Supplier, person or organization if requested by the Port. If the Fort or <br />Engineer afrer due investigation has reasonable objection to any proposed Subcontractor, <br />PI:II • <br />
The URL can be used to link to this page
Your browser does not support the video tag.