My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3501 SR 529 2016-01-01 MF Import
>
Address Records
>
SR 529
>
3501
>
3501 SR 529 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 8:11:25 AM
Creation date
3/10/2017 12:05:32 AM
Metadata
Fields
Template:
Address Document
Street Name
SR 529
Street Number
3501
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />� <br />PORT OF EVERETT SECf10N 00800 <br />UNION SLOUGH MARSH MITIGAT[ON SUPPLEMENTARY CONDITIONS <br />SuppGer, other person or organization, either may before tho Notice of Awazd is given <br />request the appazent successful Bidder to submit an acceptabk substitute; or <br />If apparent successful Bidder declines to make any such substitution, the Port may awazd <br />the contract to the next lowest Bidder that proposes to use acecptable Subcontractors, <br />SuppGers, and other persons and organizations. The dxW�ing to make rcquested <br />substitutions will constitute grounds for sacrificing the Bid security of any Bidder. <br />The CONTRACTOR shall be requ¢ed to perform a minimum of fifty percent (50%) of the <br />� totai cost of the work, and be lirmted to subcontracting a maximum of fifty percent (5090) <br />of the total cost of the work as stated in the Agreement. <br />7. <br />Insofaz as is practicable, the CONTRACfOR shall make pa�m�ent for subcontract work on <br />the same basis of ineasurement as appGes under the prittie Agreement. <br />The subco.^.uacting of any of the work to be done will in no way relieve the <br />CON'TRACTOR of any part of his responsibility under the Agreement. <br />Re aina <br />Article 14.2 of the General Conditions is amended to include the following: <br />"The retainage percent amounts withheld from progress payments aze shown below and <br />are expressed on a percentage of the work completed to date, including materials and <br />equipment stored on the project site but not yet inco�porated into the work. <br />Retaina¢e <br />5'Yo <br />Execution of Agreement <br />Percent of Work Compkte <br />0 to 1009b <br />Amend the first sentence of Section 2.2 of the General Conditions to read as follows: <br />"By CON.i'RACTOR: The Bidder whose proposal is accepted shall execute the <br />Agreement and fiunish the required bonding within seven (7) calendaz days after <br />presentation af the Agr�ment for signature." <br />Perfomiance an I�(�her Bonds <br />a. CONTRACI'OR shall fiunish a performance bond in an amount at least equal to <br />� the Contract Price (unless otherwise provided} as secunry for the faithful <br />performance of all C'ON'I'RACTOR's obligations i.ider the Procu:ement <br />Documents. This bond shall rert�ain in effect at least until one yeaz after the date of <br />final payment, except as othetwise provided by law. <br />
The URL can be used to link to this page
Your browser does not support the video tag.