Laserfiche WebLink
PORT OF EVERETT SECTION 02900 <br />UMON SLOUGH MARSH MIT[GATION PLANT[NG AND SEEDING <br />� <br />� Tras: 8 oz. <br />Stwbs: 4 oz. <br />Groundcover. 2 oz. <br />I2. Agriform Tabkts: Planting tabkts, 21-gram siu, as manufactured by <br />Agriform Intemational Chemicals, Inc., 20-10-5 analysis. Apply at rate of: <br />Tras: 5 tabkts <br />Shrubs: 3 tabkts <br />Groundcova: 2 tabkts for 1 gallon plants <br />1 tabkt for 4 inch pots <br />2.5 3TAKES AIVD GUYS <br />A. Material as per standazd details in Appendix. <br />2.6 MULCH <br />A. Composted Mukh as approved. <br />PART 3 - EXECUT[ON <br />3.1 PREPARAT[ON <br />A. Subgrade shall be inspected and approved by Owner or authoriud representative <br />prior to topsoil placement end finish grading. <br />B. Finish Grading (all plenting, and saded areas): <br />Finish grade all planting azeas and 6ne grade as may be necessary or <br />incidental to all plenting operations. Establish 5nish grades in accordance <br />with ekvations shown in the Ihawings, insuring that no pockets nor any <br />other surface obstructions to posiNve drainage are present. <br />2. Subgrades, unkss otherwise indicatal, shall be 6 inches below 5nish grade <br />in planting azeas and 4 inches in seeded areas to allow for topsoil <br />placoment, as shown on Drawings. Prior to placing topsoil in areas, <br />thoroughly rototill all areas to a depth of 6 inches. <br />3. Place 4 inches topsoil uniformly over entice planting azeas and rototill to a <br />depth of 6 inches, incorporating subsoil with topsoiL <br />4. Rake, float, drag, roll and perfonn all ►�ecessary operations to remove <br />surface irregularities and to provide a fnm, smooth surface with positive <br />surface drainage. Remove all rocks, sticks, and otha debris 2 inches and <br />larger in planting azeas and saded areas. <br />1 'll <br />