My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3501 SR 529 2016-01-01 MF Import
>
Address Records
>
SR 529
>
3501
>
3501 SR 529 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 8:11:25 AM
Creation date
3/10/2017 12:05:32 AM
Metadata
Fields
Template:
Address Document
Street Name
SR 529
Street Number
3501
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PORT OF EVERETT <br />UNION SLOUGH MARSH MIT[GATION <br />C�,pies of Documents: <br />SECi'[ON 00700 <br />GENERAL CONDCI70NS <br />2.3 The PORT shall furnish to CONTRACI'OR one (I) set of Contract drawing reproduc�ble sepias <br />and six (6) copies (unless otherwise specified) of the Contract Documents as are nasonably necessary <br />for the execution of the Wotk. Additional copies will be furnished, upon request, at the cost of � <br />reproduction and postage. . <br />� .,L, . � �: 11_ , � � .�� <br />2.4 The Contract Time will cortunence to run on the effective date stated in the Notice ro Proceed, <br />but in no case shall it be lata than seven (7) days zfrer the date of the Notice ro Procad ktter. M <br />executed copy of the Agreement will be transmitted to the CONTRACfOR by the PORT with the <br />Notice to Proceed. <br />u ' r <br />2.5 The COIVTRACC'OR shall show evidence that work has cortunenced on the project <br />within seven (7) days from the effective date of the Notice to Procad. Work in this case is not <br />limited to physical work at the project site. Work started prior to the effective date stated in the <br />Notice to Procad shall be at the CONTRACCOR's risk. <br />2.6 Before undertaking eacli part of the Work, CONTRACI'OR shall carefully study a►id compaze <br />the Contract Documents and check and verify pertinent figures shown thereon and all app6cable field <br />measurements. CONTRACTOR shall promptly report in writing to ENGINEER any conflict, e�ror <br />or discrepancy which COIV7RACTOR may discover; however, COIVTRACTOR shall not be liable to <br />PORT or ENG[NEER for failure to report any conflict, error or discrepancy in the Drawings or <br />Spu:ifications, unless CONTRACCOR had actual knowledge thereof or should reasonably have <br />known thereof. <br />2.7 Within 6ve (5) days after the e�'xtive date of the Notice to Procad and prior to start of work <br />(unless otherwise speci5ed in thc General Requirements), CONTRACfOR shall submit to <br />ENGINEER for review an estimatcd progress schedule indicating the starting and compktion dates <br />of the various stages of the Work, a preliminary scheduk of Shop Drawing subrnissions. The schedule <br />shall include a bar chan. The CONCRACI'OR may use a cor►vnercial program such as the "Harvard <br />Project Planner" or equal. <br />2.7.1 Within 6v� (5) days after the effa:tive date of the Notice to Proceed and prior ro start of work <br />(unless othcrwise specified in the General Requ:rements), CONTRAC'COR shall submit to <br />ENG[NEER for review a preliminary schedule of the values of the work. Each bid item shall be <br />00700-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.