Laserfiche WebLink
PORT OF EVERETT <br />UN10N SLOUGH MARSH MITIGAT[ON <br />SECfION 00700 <br />GENERAL CONpI7'[ONS <br />' broken down to its basic elements. For both .vmp sum and unit price estimates the breakdown of <br />( cost shall include: <br />I <br />I. labor <br />2. materials <br />3. ennipment <br />4. ovahead, pro5t and taxes <br />5. otherfactors <br />6. t'une requ'ved <br />2.8 Beforc any Work at the site is started, CON'I'RpCI'p[t shall deliver to PORT, wich a copy to <br />ENGIIv'BER, certiScates, copies of the policies (and other evidence of insur�nce royu�sted yy ppR7� <br />which CONTI�ACi'OR is required to purchase and maintain �in accotdana with paragraphs 5.3 and <br />5.4. <br />ii: . i !i � � . � �.,� �... <br />2.9 V1Within seven (7) days after the egective date of the Agrament, bat yefore CpNTRpCTOR <br />starts the Work at the site, a conference vvill be held for revievv of the scheduks to estal�lish <br />procedures for handling Shop Drawings, snd other subrtrittaLc and for processing qpplica��ons for <br />Payrttnt, and to establish a worlcing understazding among the parties ac to the Work. <br />END ART[CLE 2 <br />