Laserfiche WebLink
PORT OF EVERETT <br />j UMON SLOI.'GH MARSH MITIGATTON <br />I <br />ARTiCLE 7- WORK BY OTF�RS <br />SECTION 00700 <br />GENERAL CONDITIONS <br />7.1 PORT may perform additional work related to the Project by himself, or have additional work <br />perfom�ed by utility service companies, or kt other d�rect contracts therefor whi�;h shatl cont; in <br />General Conditions similar to these. CONTRACTOR shnll afford �he utiliry service companies and <br />the other contractors who are parties to such direct contracts (or PORT, if PORT is performing the <br />additional wo�k with PORT's empbyas) reasonabk opFortunity for the inaoduction and storage of <br />materials and equipment and the execution of work, and shall properly connect and coordinate his <br />Work with the'vs. <br />7.2 If any part of CONTRACTOR's Work depends for proper execution or results upon the work of <br />S any such other contractor or utility servia company (or POR'1�, CONTRACTOR shall inspect and <br />promptly repon to BNGINEEFt in writing any patent or apparent defects or deficiencies in such work <br />that render it unsuitable for such Qroper execution and resahs. CONfRACTOR's failure so to report <br />� sliall constitute an acceptance of the other work as 6t and proper for integrarion with <br />CONTRACTOR's Work except for latent or non-apparent defects and de5ciencies in the other work. <br />7.3 CONTRACI'OR shall do all cutting, fitting and patching of his Work that may be requ¢ed to <br />make its several parts come together properly and integrate with such other work. CONTRACfOR <br />shall not endanger any work of others by cutting, excavating or otherwise altering the'v work and will <br />only cut or alter their work with the written con�ent of ENGINEER and the others whose wo�k will <br />be affected. <br />7.4 If the performance af atiditional work by other convactors or utility service companies or PORT <br />was not noted in the Conaact Documents, writ.cen notice thareof shall be given to COIVTRACTOR <br />prior to starting any such additional work. PORT shall coordinate and schedule any such additional <br />Work not noted in the ContraM Documents to avoid interferonce or conflict with ongoing or <br />scheduled work by the CONTRACI'OR. <br />7.5 Bidders shall complete the "Subcontractor Work Listing" on the foim provided. Follow <br />inswctions listed on the form Bidders shall submit a statement of proposed ekctrical and <br />mechanical subcontractors within one hour o� the bid opening. A list of propused subcontractors, <br />other than electrical and mechanical, shall be compkted and provided within 24 hours of a request by <br />OWNER. Failure to comply may ronder the bidder's bid non-rosponsive. <br />END AR7'[CLE 7 <br />