Laserfiche WebLink
PORT OF EVGRE7'1' <br />UMON SLOUGH MARSH MIT[GA710N <br />SECTION 00700 <br />GENERAL CONDITIONS <br />within forty-five days of such occurrence unkss ENGINEER allows an additional period of time to <br />ascertain more accurate data <br />9.9 The rendering of a decision by ENGINEER parsuant to paragraph 9.8 with respect to any such <br />dispute (except any which have ban waived by the rt�aking or acceptancx of final payment as <br />provided in pazagraph 14.16) will be a condition praedent to any exercise by PORT or <br />CONTRACI'OR of such rights or romedir: as either may otherwise have under the Contract <br />Documents or at law in respect of any such dispute. ' , <br />�i� :� i � � 1�1 :: 7�.� t� f, <br />9. IO Noither ENGIIVEER's authority to act under this Anicle 9 or elsewhere in the Conttact <br />Documents nor any dxision mede by ENGINEER in good faith eitl�er to exercise or not exercise <br />such authority shall give rise to any duty or responsibility of ENGINEER to CON['RACTOR, any <br />5ubcontractor, any manufacturer, fabricator, supplier or distributor, or any of theu agents or <br />employees or any other person performing any of the Worlc. <br />9.11 Whenever in the Contract Documents the trnns "as ordered��� °8S d1IGCiCd°� °85 fU�LLICGd"� "'d$ <br />allowed" or ternu of like effect or im�ort are used, or the ad�e;.tives "reasonable", "suitabk", <br />acceptable , proper or satisfactory or adjectives of lil�e effat or im�ort are used, to describe <br />requfrement, direction, review or judgment of ENGINEER as to the Work, it is intended that such <br />requaement, direction, review or judgment will be sokly to evaluate the Work for compliance with <br />the Conaact Documents (unkss there is a speci5c seatement indicatin� otherwise). The use of any <br />such tenn or adjective oever indicates that ENGINEER shall have authority to supervise or direct <br />perfoemance of the Work or authority to undertalce responsibility contrary to the provisions of <br />pazagraphs 9.12 or 9.13. <br />9.12 ENGINEER will not be responsibk for CONTRACI'OR's rt�eans, methods, techniques, <br />sequences or procedures of construction, or the safety precautions and programs i�ident thereto, and <br />ENGINEER will not be responsible for COIVTRpCTOR's failure to perform the Work in accordance <br />with the Contract Documents. <br />9.13 ENGINEER will not be responsibk for the acts or omissions of CONTRACTOR or of any <br />Subconvactors, or of the agents or ert�loyees of any CONTRACTOR ot Subcontracto:, or of any <br />other persons at the site or otherwise perfomting any of the Work. <br />Amendin a �kmentin¢ Convact Docu �rc <br />9.14 T'he Contract Documents may be amended to provide for additions, deletions and revisions in <br />the work or to modify the terttis and conditions thereof in one or more of the following ways: <br />00700-32 <br />