My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3501 SR 529 2016-01-01 MF Import
>
Address Records
>
SR 529
>
3501
>
3501 SR 529 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 8:11:25 AM
Creation date
3/10/2017 12:05:32 AM
Metadata
Fields
Template:
Address Document
Street Name
SR 529
Street Number
3501
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PORT OF EVERETT <br />UMON SLOUGH MARSH MITIGATION <br />ARTICLE 11 - CHANGE OF CONTRACT PRICE <br />SECTIOY 00700 <br />GENERAL CONDITIONS <br />1 l.l The Contract Price constitutes the total compensation (subject to authorized adjustments) <br />payable to CONTRACfOR for perfomting the work. All duties, responsibilities and obGgations <br />assigned to or undertaken by CONTRACTOR shall be at his expense without change in the Contract <br />Price. <br />11.2 The Contract Price may only be changed by a Change Order exxuted by the PORT and <br />CONTRACTOR, or by a force account d'uective issued by PORT. No other ciceumstance (except as <br />indicated in Article 13.9 and 15.1) shall be conswed as the basis for a change in the Cont�act Price. <br />11.3 The value of any Work covered by a Change Order or force account d'uective shall be <br />detemiined in one of the following ways: <br />11.3.1 Where the work involved is covered by unit prices contained in the Conuact Documents, by <br />application of the unit prices to the quantities invoived (subject to the provisinns of paragraph 11.9}. <br />113.2 By mutual acceptance of a lump sum <br />11.3.3 On the basis of tho Cost of the Work (determined as provided in pazagraphs 11.4 and 11.5) <br />plus a Conaactor's Fee for overhead and pro5t (deterntined as provided in pazagraph 11.6). <br />Cost of the Work: <br />11.4 The term Cost of the Work means the sum of all costs necessarily incurred and paid by <br />COIV7'EtACTOR in the proper perfomiance of the Work. Excc,�t as otherwise may be agreed to in <br />�vriting by PORT, such costs shall be in amounts no higher than those prevailing in the locality of the <br />Project, shall include only the following items and shall not include any of the costs itemized in <br />pazagra�h 11.5: <br />11.4.1 Payroll costs for employees in the d'vect employ of COIVTRACTOR in the perfomiance of the <br />work under schedules of job classi5cations agrad upon by PORT and CoNI'RACCOR. Payroll <br />costs for ertq�loyees not employed full time on the Work shall be apportioned on the basis of thea <br />time spent on the Work. Payroll costs shall include, but not be limited to, salaries and wages plus the <br />cost of fringe benefits which shaU includo social security contributions, unert�loyment, excise and <br />payroll taxes, workers' or workmen's compensation, health and retirement benefits, bonuses, sick <br />leave, vacation and holiday pay appGcable thereto. Such employees shall includo superintendents and <br />foremen at the site. The expenses of performing Work after regu3az working hours, on Sunday or <br />legal holidays, shall be included in the above to the extent authorized by YORT. <br />I 1.4.2 Costs of all materials and equipment fiunished and incorporated in the Work, including costs <br />of transportation and storage thereof, and manufacturers' 6eld services required in connection <br />00700-35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.