My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000 TOWER ST GRAY WOLF HALL 2018-01-01 MF Import
>
Address Records
>
TOWER ST
>
2000
>
GRAY WOLF HALL
>
2000 TOWER ST GRAY WOLF HALL 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2019 1:11:31 PM
Creation date
3/10/2017 5:29:09 AM
Metadata
Fields
Template:
Address Document
Street Name
TOWER ST
Street Number
2000
Tenant Name
GRAY WOLF HALL
Notes
UNDERGRADUATE EDUCATION
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Responsible <br /> Official: Allan Giffen, Director <br /> Title: Planning and Community �evelopment Responsible Officiai <br /> Address: 2930 Welmore Avenue, Suite 8-A, Everett, \NA 98201 <br /> Date: April 20, 2007 <br /> Signature:� ' �� � } /�!`/}�1 <br /> /l� <br /> You may appeal this delerminalion by filing an appeal or, forms provided by the ' ianning <br /> Department and a fee to the PlanninglCommunity Development Perriit Services Counter at <br /> 3200 Cedar Slreet, 2nd Floor, no laler ihan 14 days irom the date the MDNS becomes tinal <br /> (which is afler the 14-day commen: periodl. <br /> Contact Faheem Siddiq to reac� or asY, about the procedures for SEPA appeals. <br /> NOTE: A DNS may bc withdrawn in the event of significant chang2s in the proposal, <br /> disclosure of new significant information, misrepresentation by the applicant, or <br /> failure to comply wilh the conditions upon which this Determination of Non- <br /> Signi(icance is predicaled. <br /> INFORMATION FOR DEVELOPER: <br /> The following iniormation is provided fo; the deveioper's benefiL These are not SEPA <br /> conditions but are associaled with other laws or reyuirements. All requirements are preliminary <br /> in nature, and are based upon ihe pre�iminary site plan and lhe ordinances in effect at the time <br /> o( submitlal for SEPA review. The proposal must c imply with all ordinances in effect at the <br /> time a complete building permit application is filed, including those not specifically set <br /> (or herein. (Exception: For vesting under lhe Zoning Code, please refer to Section 44 of the <br /> Zoning Code). Contact lhe Planning Department for information regarding appeals processed <br /> for lhe requiremenls listed in ihis documenL <br /> 1. A Public Works Permi� is required for lhis project. Detailed drawings in accordance �vith <br /> City Design and Conslruction Standards shall be submilted to ihe Public Works <br /> Department, shewing s�1e parking layout, landscaping, utililies, storm drainage, lemporary <br /> construction erosion control, and all required improvements in lhe public right-of-way. <br /> Public Works Departrnenl approval of these drawings is required prior to any permits being <br /> issued. All improvements shall be completed, approved and warranted before the <br /> Occupancy Permit is issued/finai approval is granted. <br /> 2. Parking must be Fer Cily Zoning Code and City Design and Construction Standards for <br /> Development. <br /> 3. No traffic mitigation (ee due (reduclion in on campus student populalions). <br /> 4. Provide good pedesirian connection to ali offsile parking areas. <br /> 1 <br /> �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.