Laserfiche WebLink
i <br /> Responsible <br /> Official: Allan Giffen, Director <br /> Title: Planning and Community �evelopment Responsible Officiai <br /> Address: 2930 Welmore Avenue, Suite 8-A, Everett, \NA 98201 <br /> Date: April 20, 2007 <br /> Signature:� ' �� � } /�!`/}�1 <br /> /l� <br /> You may appeal this delerminalion by filing an appeal or, forms provided by the ' ianning <br /> Department and a fee to the PlanninglCommunity Development Perriit Services Counter at <br /> 3200 Cedar Slreet, 2nd Floor, no laler ihan 14 days irom the date the MDNS becomes tinal <br /> (which is afler the 14-day commen: periodl. <br /> Contact Faheem Siddiq to reac� or asY, about the procedures for SEPA appeals. <br /> NOTE: A DNS may bc withdrawn in the event of significant chang2s in the proposal, <br /> disclosure of new significant information, misrepresentation by the applicant, or <br /> failure to comply wilh the conditions upon which this Determination of Non- <br /> Signi(icance is predicaled. <br /> INFORMATION FOR DEVELOPER: <br /> The following iniormation is provided fo; the deveioper's benefiL These are not SEPA <br /> conditions but are associaled with other laws or reyuirements. All requirements are preliminary <br /> in nature, and are based upon ihe pre�iminary site plan and lhe ordinances in effect at the time <br /> o( submitlal for SEPA review. The proposal must c imply with all ordinances in effect at the <br /> time a complete building permit application is filed, including those not specifically set <br /> (or herein. (Exception: For vesting under lhe Zoning Code, please refer to Section 44 of the <br /> Zoning Code). Contact lhe Planning Department for information regarding appeals processed <br /> for lhe requiremenls listed in ihis documenL <br /> 1. A Public Works Permi� is required for lhis project. Detailed drawings in accordance �vith <br /> City Design and Conslruction Standards shall be submilted to ihe Public Works <br /> Department, shewing s�1e parking layout, landscaping, utililies, storm drainage, lemporary <br /> construction erosion control, and all required improvements in lhe public right-of-way. <br /> Public Works Departrnenl approval of these drawings is required prior to any permits being <br /> issued. All improvements shall be completed, approved and warranted before the <br /> Occupancy Permit is issued/finai approval is granted. <br /> 2. Parking must be Fer Cily Zoning Code and City Design and Construction Standards for <br /> Development. <br /> 3. No traffic mitigation (ee due (reduclion in on campus student populalions). <br /> 4. Provide good pedesirian connection to ali offsile parking areas. <br /> 1 <br /> �� <br />