My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000 HEWITT AVE EVERETT EVENT CENTER 2016-01-01 MF Import
>
Address Records
>
HEWITT AVE
>
2000
>
EVERETT EVENT CENTER
>
2000 HEWITT AVE EVERETT EVENT CENTER 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2017 2:11:53 PM
Creation date
3/16/2017 8:00:07 AM
Metadata
Fields
Template:
Address Document
Street Name
HEWITT AVE
Street Number
2000
Tenant Name
EVERETT EVENT CENTER
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � <br /> part of the Sheli Project and are not a part oF this TI Project. No blocking <br /> requirements are foreseen within TI Project rated shaftwall conditions. <br /> 7. Listing U438 for wall type N6/A8.0 requires Type C for two layers of 1/2" GWB. <br /> BNBH: Addendum No. 4, dated June 3, 2003, revised the listing for Wall Type N6 from <br /> U438 to U415. U. S. Gypsum Co. Document SA926 09250 Shaftwall Systems, <br /> states that 5/8" Type X gypsum panels may be substituted for 1/2" Type C <br /> gypsum panels. <br /> 8. The fire protection of the two-hour wall should be continuous through the intersection <br /> shown in Detail 9/A11.0. Section 70P.1 <br /> BNBH: Addendum No. 4, dated Jwie 3, 2003, replaced Detail 9/A11.0 with drawing <br /> SK-A11.0-2, Detaii 9 Wall Intersection Framing Off-set, Typ. This detail now <br /> shows a continuous 2-hour wall condition turning the corner. <br /> 9. The floor of the toilet rooms on the first floor should be a smooth, hard nonabsorbent <br /> surface such as Portland cement, concrete, ceramic tile or other approved material that <br /> extends upward onto the walls at least 5 inches. Section 807.1.1 <br /> BN&H: Addendum No. 1, dated May 12, 2003, replaced drawing sheet A10.0, Room <br /> finish and Door Schedules. The repiacement sheet A10.0 calls for porcelain <br /> tile for the flooring and base of the 1st Le��el restrooms. <br /> 10.The toilet room keynotes on sheet A6.2 should be completed. <br /> BN&H: Addendum No. 2, dated May 20, 2002, corrected the miss-numbered keynotes. <br /> Exiting <br /> 1. it has been determined that the four doors from the arena (horizontal exit) on the <br /> second level do not serve an occupant load of 50 or more from the "city building" side <br /> (Door 202A is less than 20' from the main corridor) and therefore a dead-end condition <br /> does not exist. Door 216A may be removed. Section 1004.2.6 <br /> BN�.H: Door 216A is retained for occupant access functional needs. <br /> 2. Corridors 012 & 219 are not required to be rated corridors. They may be changed to <br /> haliways. Section 1004.2.2 <br /> BN&H: Addendum No. 4, dated June 3, 2003, revised drawing sheet A1.2 Second <br /> Level Floor Plan to delete the 1-hour rated wall symbol from the north wall of <br /> Wait Service #219. That addendum also revised drawing sheel A10.0 Room <br /> Finish and Door Schedules to delete the 20 minute fire rating label for doors <br /> No. 219A, 219B and 219C. No changes have been made for Corridor 012. <br /> 3. The exit access doors from meeting rooms 2 & 3 into corridor M14 should be separated <br /> from each other by a minimum of 1/2 the diagonal of the combined rooms (M05 & M06) <br /> as the share a required 2nd exit. Section 1004.2.4 <br /> BN&H: Addendum No. 2, dalad May 20, 2003, revised drawing sheet A1.1 Mezzanine <br /> Level Floor Plan to delete door M05C; and to add occupancy signage to both <br /> meeting rooms M05 and M06 reading "Maximum Occupancy 49". <br /> 4. Doors requiring panic hardware should be speci(ied on the door schedule. Section <br /> 1007.2.5 <br /> 3l <br />
The URL can be used to link to this page
Your browser does not support the video tag.