Laserfiche WebLink
� � <br /> part of the Sheli Project and are not a part oF this TI Project. No blocking <br /> requirements are foreseen within TI Project rated shaftwall conditions. <br /> 7. Listing U438 for wall type N6/A8.0 requires Type C for two layers of 1/2" GWB. <br /> BNBH: Addendum No. 4, dated June 3, 2003, revised the listing for Wall Type N6 from <br /> U438 to U415. U. S. Gypsum Co. Document SA926 09250 Shaftwall Systems, <br /> states that 5/8" Type X gypsum panels may be substituted for 1/2" Type C <br /> gypsum panels. <br /> 8. The fire protection of the two-hour wall should be continuous through the intersection <br /> shown in Detail 9/A11.0. Section 70P.1 <br /> BNBH: Addendum No. 4, dated Jwie 3, 2003, replaced Detail 9/A11.0 with drawing <br /> SK-A11.0-2, Detaii 9 Wall Intersection Framing Off-set, Typ. This detail now <br /> shows a continuous 2-hour wall condition turning the corner. <br /> 9. The floor of the toilet rooms on the first floor should be a smooth, hard nonabsorbent <br /> surface such as Portland cement, concrete, ceramic tile or other approved material that <br /> extends upward onto the walls at least 5 inches. Section 807.1.1 <br /> BN&H: Addendum No. 1, dated May 12, 2003, replaced drawing sheet A10.0, Room <br /> finish and Door Schedules. The repiacement sheet A10.0 calls for porcelain <br /> tile for the flooring and base of the 1st Le��el restrooms. <br /> 10.The toilet room keynotes on sheet A6.2 should be completed. <br /> BN&H: Addendum No. 2, dated May 20, 2002, corrected the miss-numbered keynotes. <br /> Exiting <br /> 1. it has been determined that the four doors from the arena (horizontal exit) on the <br /> second level do not serve an occupant load of 50 or more from the "city building" side <br /> (Door 202A is less than 20' from the main corridor) and therefore a dead-end condition <br /> does not exist. Door 216A may be removed. Section 1004.2.6 <br /> BN�.H: Door 216A is retained for occupant access functional needs. <br /> 2. Corridors 012 & 219 are not required to be rated corridors. They may be changed to <br /> haliways. Section 1004.2.2 <br /> BN&H: Addendum No. 4, dated June 3, 2003, revised drawing sheet A1.2 Second <br /> Level Floor Plan to delete the 1-hour rated wall symbol from the north wall of <br /> Wait Service #219. That addendum also revised drawing sheel A10.0 Room <br /> Finish and Door Schedules to delete the 20 minute fire rating label for doors <br /> No. 219A, 219B and 219C. No changes have been made for Corridor 012. <br /> 3. The exit access doors from meeting rooms 2 & 3 into corridor M14 should be separated <br /> from each other by a minimum of 1/2 the diagonal of the combined rooms (M05 & M06) <br /> as the share a required 2nd exit. Section 1004.2.4 <br /> BN&H: Addendum No. 2, dalad May 20, 2003, revised drawing sheet A1.1 Mezzanine <br /> Level Floor Plan to delete door M05C; and to add occupancy signage to both <br /> meeting rooms M05 and M06 reading "Maximum Occupancy 49". <br /> 4. Doors requiring panic hardware should be speci(ied on the door schedule. Section <br /> 1007.2.5 <br /> 3l <br />