Laserfiche WebLink
Task 6 — Cost Estimates and Construction Schedule <br />I. Task 6 — Cost Estimates and Construction Schedule is revised to reflect additional support (i.e., <br />increased project area and additional 65% submittal associated with Schedule A1. <br />Task 7 — Permitting <br />I . Task 7 — Permitting is revised to reflect the level of effort anticipated. The budget is increased to <br />allow for additional permit assistance related to the BNSF railway crossing at Bond Street and <br />SEPA/NEPA preparation for the CSO site, and/or other permitting assistance as may be requested by <br />the City. <br />Task 8 — Public Involvement <br />1. Task 8 — Public Involvement is revised to reflect an increased level of support (Le. additional public <br />meeting)_ <br />Task 9 — Bidding <br />I . No additional items associated with this amendment relate to Task 9 — Bidding <br />Task 10 — Construction Support Services <br />I . This amendment expands Task 10 —Construction Support Services to include review and evaluation <br />of private side sewer inspection records, i -e_ CCTV video and sketches, created by the construction <br />contractor as part of the Schedule C construction contract. A ranking system shall be used to <br />establish side sewer replacement priority. A written report will summarize replacement options and <br />recommendations. <br />Task 11 — Unanticipated Tasks <br />1. No additional items associated with this amendment relate to Task I I — Unanticipated Tasks. <br />M <br />4 <br />