My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/03/26 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/03/26 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2017 9:51:42 AM
Creation date
3/22/2017 9:51:10 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/26/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> Broadway Arterial <br /> March 6, 2008 <br /> Page 3 of 4 <br /> Assumptions: <br /> • Gibson Traffic Consultants will conduct all of the visual fieldwork necessary for the intersection <br /> analysis, but this does not include any formal land survey information. <br /> • Gibson traffic will post process the PSRC traffic volume/growth projections based on best <br /> engineering judgment. No new modeling will be conducted for this analysis. <br /> • The city will provide all existing comprehensive transportation plans, transportation plans that <br /> will be required to be post processed to calibrate the future volume forecasts. <br /> • The city will provide existing daily and intersection turning movement count data needed for <br /> establishing the peak analysis period for the operational analysis and conducting the existing <br /> LOS. <br /> • GTC will attend/organize up to a total of 6 meetings with city staff, Everett Transit, Everett <br /> School district and PSRC staff as well as other consultants who have worked on the <br /> compressive plans and development TIA's in this area. <br /> • The city will provide an existing non-calibrated synchro system that has existing signal timing <br /> and balanced volumes. <br /> • GTC will conduct the travel time surveys for Synchro and calibrate the synchro system and <br /> establish the network for Sim Traffic analysis. <br /> • GTC's analysis is conducted based on the City counts conducted before the final opening of the <br /> I-5 SPUI/Everett widening project. Any additional counts, calibration and changes to the report <br /> based on final opening of the Everett widening project is outside the scope of this contract and <br /> would be considered additional work. <br /> • The analysis does not include: <br /> • Cost estimates for improvements <br /> • Development permit review analysis <br /> • Retaining wall or design CAD analysis <br /> • Drainage/design or impact analysis <br /> • Signal design or coordination strategies <br /> • Inclusion of pipeline data <br /> • Survey or ROW review <br /> • New counts other than travel time survey for synchro calibration <br /> Deliverables: <br /> • Full level of service Needs Report for the corridor drawing conclusions from the traffic analysis <br /> and summarizing the analysis completed by GTC with improvement recommendations and <br /> planning level constraints assessment. Also need for other modes of transportation will be <br /> addressed. <br /> • Recommended long term transportation improvements <br /> • Intersection and Corridor Level of Service (LOS)tables summarizing analysis results. <br /> • Intersection LOS analysis runs. <br /> 20 <br /> gOOM <br /> RAFT C <br />
The URL can be used to link to this page
Your browser does not support the video tag.