My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/04/30 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/04/30 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2017 8:14:07 AM
Creation date
3/22/2017 11:37:33 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/30/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A - 4 <br />SCOPE OF WORK <br />8. Maintain Files. Maintain hard copy and electronic records and files at the job site. <br />These records and files shall include: <br />• Correspondence <br />• Submittals <br />• Requests for Clarifications (RFC's) <br />• Change Orders <br />• Daily reports <br />• Preconstruction and construction progress photos and videotapes <br />• Maintain complete set of updated contract documents including drawings, <br />addenda, proposal, general provisions, special provisions, shop drawings and <br />change orders <br />• Test reports <br />• Survey notes including cut sheets (as provided by the Construction <br />Contractor) <br />• Transmittal records <br />• Record of weather and wet days and tide levels <br />• Construction Contractor payment requests and prevailing wage certifications <br />• Shop drawing transmittal records <br />• Construction correspondence <br />Standard Contractor (MWH) forms will be used where applicable, for records and <br />reporting procedures. At completion of the work, and prior to final acceptance, <br />provide the City with all completed field books, project daily reports, summary <br />tabulations of installed bid breakdown quantity items, field notes, and other job <br />records as listed above. <br />9. Formal Acceptance, Review and Recommendation. Make recommendations to the <br />City concerning intermediate completion dates, operational acceptance, substantial <br />completion, and final acceptance of the work. Include review of requests for <br />extension of time by the Construction Contractor. <br />B. Field Engineering Services. Provide the services of a full time Construction <br />Manager/Inspector (and Senior Inspector if needed due to an accelerated project <br />schedule) to perform the following services: <br />CW <br />1. On -Site Field Observation and Monitoring. Provide on-site field observation and <br />monitoring to observe the quality and progress of the construction to help determine <br />if the work is performed in general conformance with provisions of the construction <br />MWH Page 3 EVERETT PHASE 6 <br />4/17/08 EXHIBIT A-4 SCOPE OF WORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.