My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/06/04 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/06/04 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2017 10:16:24 AM
Creation date
3/24/2017 10:15:42 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/4/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. Follow-up coordination will be performed by the Consultant Permit Lead. Up to two <br /> resubmittals will be required. A total of 110 hours are included in this scope to perform <br /> this task, including telephone conversations with agencies on status of their review and <br /> response to comments. No meetings are included with this task. <br /> Deliverables <br /> 1. Telephone conversation records. <br /> 2. Draft permit applications (up to 7 permit applications and supporting materials are <br /> anticipated). (two hardcopies) <br /> 3. Final permit applications (two hardcopies) <br /> 4. Stormwater Pollution Prevention Plan required as part of the NPDES Stormwater <br /> Construction General Permit. <br /> 5. Targeted Drainage Plan required as part of the Snohomish County Grading Permit. <br /> 6. Draft and final responses to comments <br /> 3.0 Task 300 — Public Outreach <br /> 3.1 Subtask 301 — Public Outreach Assistance <br /> Purpose <br /> It is understood that the City will lead the public outreach program with assistance from the <br /> consultant team. This task is to provide project materials for the City to use in the City's public <br /> outreach program. <br /> Consultant Services <br /> 1. Provide technical information and materials to the City for the City's preparation of <br /> outreach materials such as door hangers. <br /> City Responsibilities <br /> 1. Lead and conduct the public outreach program. <br /> Assumptions <br /> 1. The consultant team is providing limited technical assistance to the City's outreach <br /> program. <br /> Deliverables <br /> 1. PDF files for the City's use in outreach materials. <br /> 4.0 Task 400 — Engineering Analysis and Design <br /> 4.1 Subtask 401 — Traffic Plan <br /> Purpose <br /> The pipeline route crosses several roads. Traffic control plans are needed in order to reduce <br /> impacts to the local citizens. <br /> 2 <br /> Everett Replacement of Water Transmission Line No.2 8 of 21 <br /> Phase 8B Scope of Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.