Laserfiche WebLink
Pao z <br /> C3 BID TABULATION Bond Street Site Cleanup W.O.# UP 3356 -6/6/08 Cr) <br /> Prepared By:Eugene Houtby <br /> For:Heather Griffin,Project Engineer ENGINEER'S ESTIMATE AEC Clearcreek Contractors Wyser Construction Inc. Waka Group Inc. <br /> ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL <br /> # ITEM DESCRIPTION UNIT QUAN PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT <br /> 1 Mobilization LS I $13,000.00 $13,000.00 $30,936.10 $30,936.10 $3,500.00 $3,500.00 $35,000.00 $35,000.00 $10,500.00 $10,500.00 <br /> 2 Temporary Erosion Control LS 1 $8,000.00 $8,000.00 $8,534.00 $8,534.00 $2,000.00 $2,000.00 $5,500.00 $5,500.00 $4,755.00 $4,755.00 <br /> 3 Street Sweeping Hour 60 $150.00 $9,000.00 $130.30 $7,818.00 $110.00 $6,600.00 $150.00 $9,000.00 $115.00 $6,900.00 <br /> 4 Dewatering LS 1 $8,000.00 $8,000.00 $17,456.50 $17,456.50 $5,200.00 $5,200.00 $15,000.00 $15,000.00 $6,500.00 $6,500.00 <br /> 5 Excavate,Stockpile,Load,and EA 3300 $33.00 $108,900.00 $12.14 $40,062.00 $9.40 $31,020.00 $14.00 $46,200.00 $7.50 $24,750.00 <br /> Haul Contaminated Soil- <br /> Non-Hazardous-Kinicer Materials, <br /> Everett <br /> 6 Excavate,Stockpile,Load,and Tons 100 $84.00 $8,400.00 $110.60 $11,060.00 $90.00 $9,000.00 $100.00 $10,000.00 $97.50 $9,750.00 <br /> Haul Contaminated Soil- Waste Management, Chemical Waste Not specified Waste Management <br /> Dangerous-Specify Subtitle C Arlington Management <br /> disposal location with bid. "less than <br /> <7.5 mg/L <br /> TCLP" <br /> 7 Excavate,Stockpile,Load,and Tons 100 $45.00 $4,500.00 $52.10 $5,210.00 $21.00 $2,100.00 $20.00 $2,000.00 $97.00 $9,700.00 <br /> Haul Contaminated Soil-Non- Allied Waste, Roosevelt Not specified Waste Management <br /> Hazardous,Lead Greater Than 250 Everett Regional <br /> mg/kg,and Passing TCLP Landfill <br /> Requirement. Specify Subtitle D <br /> disposal location with bid. <br /> 8 Dispose Contaminated Soil- Tons 3300 $41.00 $135,300.00 $21.35 $70,455.00 $47.00 $155,100.00 $37.00 $122,100.00 $51.55 $170,115.00 <br /> Non-hazardous Rinker Materials <br /> 9 Dispose Contaminated Soil- Tons 100 $220.00 $22,000.00 $140.90 $14,090.00 $180.00 $18,000.00 $200.00 $20,000.00 $158.00 $15,800.00 <br /> Dangerous.Specify Subtitle C Waste Chemical Not specified Waste Management <br /> disposal location with bid. Management, Waste <br /> Arlington Management <br /> "less than <br /> <7.5 mg/L <br /> TCLP" <br /> 10 Dispose Contaminated Soil-Non- Tons 100 $55.00 $5,500.00 $56.65 $5,665.00 $45.00 $4,500.00 $40.00 $4,000.00 $140.00 $14,000.00 <br /> Hazardous,Lead Greater Than 250 Allied Waste,Everett Roosevelt Not specified Waste Management <br /> mg/kg,and Passing TCLP Regional <br /> Requirement. Specify Subtitle D Landfill <br /> disposal location with bid. <br /> 11 Force Account FA 1 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $30,000.00 <br /> 12 Gravel Borrow Tons3200 $28.00 $89,600.00 $20.35 $65,120.00 $15.50 $49,600.00 $20.00 $64,000.00 $21.00 $67,200.00 <br /> 13 Ballast Tons 300 $28.00 $8,400.00 $40.05 $12,015.00 $23.00 $6,900.00 $25.00 $7,500.00 $25.10 $7,530.00 <br /> Subtotals: $450,600.00 $318,421.60 $323,520.00 $370,300.00 $377,500.00 <br /> TOTALS WA Sales Ta $38,751.60 $27,384.26 $27,822.72 $31,845.80 $32,465.00 <br /> Contract Tots $489,351.60 $345,805.86 $351,342.72 $402,145.80 $409,965.00 <br />