My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/07/02 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/07/02 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2017 11:43:34 AM
Creation date
3/24/2017 11:42:57 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/2/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase III — Construction Observation & Administration Services <br /> This scope of work describes the Work Elements to be accomplished by the CONSULTANT as <br /> summarized under each work element. This scope consists of the following work elements. <br /> WORK ELEMENT 1: PROJECT PLANNING & MANAGEMENT <br /> WORK ELEMENT 2: CONSTRUCTION ADMINISTRATION <br /> WORK ELEMENT 3: CONSTRUCTION OBSERVATION <br /> WORK ELEMENT 4: EARTHWORK OBSERVATION & MATERIAL TESTING <br /> WORK ELEMENT 5: STRUCTURAL REVIEW & ASSISTANCE <br /> WORK ELEMENT 6: DRAINAGE TECHNICAL ASSISTANCE <br /> WORK ELEMENT 7: LANDSCAPE REVIEW & ASSISTANCE <br /> WORK ELEMENT 8: INTELLIGENT TRANSPORTATION SYSTEMS /TRAFFIC <br /> SIGNAL REVIEW & ASSISTANCE <br /> WORK ELEMENT 9: WSDOT DESIGN COORDINATION <br /> WORK ELEMENT 10: PROJECT DESIGN ENGINEER TO ASSIST IN THE <br /> REVIEW OF FIELD MODIFICATIONS AND DESIGN <br /> CHANGES WSDOT DESIGN COORDINATION <br /> rim, <br /> DOT Form 140-063 EF J:\Trans_Design126066-41st St Arterial-Broadway Scoping Study\Project Management\Contracts\Supp 5_06-09-08.doc <br /> Revised 9/2005 Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.