My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/07/02 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/07/02 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2017 11:43:34 AM
Creation date
3/24/2017 11:42:57 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/2/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br /> 3.9. Assist the City's Senior Construction Observer with completion of initial employee <br /> interview check. <br /> Summary of Field Observation: <br /> 1. Provide the services of one full-time Construction Observer who will observe the <br /> technical conduct of the construction. <br /> 2. Attend weekly project site meetings with the Contractor, City staff, utilities, and others <br /> associated with the project construction. <br /> 4. EARTHWORK OBSERVATION AND MATERIAL TESTING—Hong West& <br /> Associates (subconsultant) <br /> 4.1. Provide on-call earthwork construction observation and material testing support during <br /> construction as outlined in the attached letter from Hong West & Associates, dated April <br /> 22, 2008. Payment for geotechnical services will be made as outlined in the attached fee <br /> structure. <br /> 5. STRUCTURAL REVIEW & ASSISTANCE—HDR Engineering, Inc. (subconsultant) <br /> 5.1. Provide submittal review for structural earth wall and SEW traffic barrier during <br /> construction as outlined in the attached letter from HDR Engineering, Inc., dated April <br /> 23, 2008. Payment for structural review services will be made as outlined in the <br /> attached fee structure. <br /> 6. DRAINAGE TECHNICAL ASSISTANCE—CH2M Hill (subconsultant) <br /> 6.1. Provide field support to address issues related to stormwater drainage facilities during <br /> construction as outlined in the attached letter from CH2M Hill, dated April 25, 2008. <br /> Payment for drainage technical assistance services will be made as outlined in the <br /> attached fee structure. <br /> 7. LANDSCAPE REVIEW & ASSISTANCE—Hough Beck& Baird,Inc. (subconsultant) <br /> 7.1. Provide submittal review and field support on landscaping and irrigation related issues <br /> during construction as outlined in the attached letter from Hough Beck & Baird, dated <br /> April 22, 2008. Payment for landscape services will be made as outlined in the attached <br /> fee structure. <br /> 8. INTELLIGENT TRANSPORTATION SYSTEM/TRAFFIC SIGNAL REVIEW & <br /> ASSISTANCE—IBI Group (subconsultant) <br /> 8.1. Provide assistance in the review of contractor submittals for construction elements that <br /> fall within the signal and interconnect systems submittal review. IBI will perform <br /> technical review of final fiber testing and documentation during construction as outlined <br /> in the attached letter from IBI Group, dated May 9, 2008. Payment for fiber optic <br /> services will be made as outlined in the attached fee structure. <br /> 9. WSDOT COORDINATION <br /> Provide design assistance and coordination with WSDOT in finalizing the channelization <br /> plan and deviation. <br /> 10. PROJECT DESIGN ENGINEER TO ASSIST IN THE REVIEW OF FIELD <br /> MODIFICATIONS AND DESIGN CHANGES. <br /> A 10.1. Provide technical assistance and agency coordination for field modifications and • <br /> Y design changes due to changes of the existing conditions or changes requested by the City. <br /> DOT Form 140-063 EF J:\Trans_Design126066-41st StArterial-Broadway Scoping Study\Projed Management\Contracts\Supp 5_06-09-06.doc <br /> • Revised 9/2005 Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.