My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/07/02 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/07/02 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2017 11:43:34 AM
Creation date
3/24/2017 11:42:57 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/2/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A-2 • <br /> -� SCOPE OF WORK <br /> TASK 06— PIPELINE CONDITION ASSESSMENT <br /> No additional work is anticipated under this task. <br /> TASK 07 —DESIGN <br /> URS will develop the design criteria in conformance with AWWA standards. The results of the <br /> previous geotechnical investigation, survey program, wetland investigation, and discussions with <br /> the City will contribute to the design criteria. Activities to be performed as part of this task <br /> include the following: <br /> • Geotechnical <br /> o Trenching design <br /> o Shoring considerations <br /> o Excavation plan <br /> • Pipeline <br /> o Design in accordance with AWWA standards <br /> o Operating pressure based on City-provided elevations and pipe profile <br /> o Load and thrust calculations <br /> o Connections from existing to new pipeline <br /> o Constructability and construction sequence <br /> o Replacing service connection to Eagle's property on west bank, if required <br /> o Coatings: interior and exterior <br /> o Blow-off valves, air-vacuum release, and other valves as needed <br /> o Simple dechlorinization vault (up to 10-ft by 10-ft in plan) <br /> • River Hydraulics <br /> o Review and update the open channel HEC-RAS model <br /> o Review and update the scour depth calculations <br /> o Set the depth of pipeline installation within the river <br /> o Design of river diversion structures during construction, including fish passage <br /> • Civil <br /> o Design pipeline dewatering and treatment of chlorinated water <br /> o Design cofferdam design for two-phase construction of the trench installation <br /> o Locate staging areas <br /> o Select best management practices <br /> o Prepare erosion and sediment control plan <br /> The design will be summarized in the Design Report(Task 08)with design calculations included <br /> as appendices to the report. The design will be used to generate the Construction Plan Drawings <br /> (Task 09). <br /> C 1 <br /> Pa&e5of10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.